There were (and continue to be) both positive and negative effects of the Snowy Mountains Hydroelectric Scheme for Australians.

During its construction, many people were displaced from their homes and, while they were offered new homes, these could not replace the memories or the fact that their families had lived in those homes for generations. The original town of Adaminaby was completely dismantled and moved to higher ground to make way for Lake Eucumbene, which would feed the Scheme. Many people lost their livelihood as well: stock (cattle, horses, etc) was no longer permitted to be grazed in the High Country.

Safety was an issue. The workers were under pressure to complete the Scheme in the quickest possible time, so were "encouraged" to work longer hours, and offered bonuses for doing so. This meant that sometimes dangerous shortcuts were taken. Over the time of the Scheme's construction, there were 121 deaths on the worksites: 35 of these occurred during tunnel construction, while the rest were on the roads in and around the sites.

However, during its construction the scheme was a valuable source of employment, for tens of thousands of Australians and post-war immigrants who fled their war-torn countries. The Scheme offered these people the chance to rebuild their lives in a new country, with opportunities they would not have otherwise had. As one of the wonders of the engineering world, the Scheme involves sixteen dams, seven power stations, a pumping station and over 225 km of tunnels, pipelines and aqueducts, so both skilled workers and labourers were attracted to the scheme.

The Snowy Mountains Scheme has many advantages still now. It generates electricity and redistributes water to the Murray River, where it is used for farming and irrigation. The total electricity capability is up to about 3700 MW, which works out to roughly 10% of the needs of New South Wales, though this depends on having enough rainfall and melting snow.

User Avatar

Wiki User

10y ago

What else can I help you with?

Continue Learning about Engineering

When did the Snowy Hydro Scheme start and finish?

Construction of the Snowy Mountains Hydro-electric Scheme began on 17 October 1949. It took 25 years to complete, so was finished in 1974. While 25 years may seem like a long time, the massive Scheme is very complex, and it was finished well under budget. The hydroelectricity and irrigation complex was built in difficult terrain in south-east Australia, in the Australian Alps between Victoria and New South Wales. It is considered to be one of the wonders of the engineering world. The Scheme involves sixteen dams, seven power stations, a pumping station and over 225 km of tunnels, pipelines and aqueducts.


Distinguish between logical data independence and physical data independence?

logical data : refer to the immunity of the external scheme towards changes in the conceptual scheme.physical data: refer to the immunity of the conceptual scheme towards changes in the internal scheme.


How do you make a car rental scheme using javascript?

You need JavaScript and HTML to make car rental scheme. You might also need a middleware.


What is SITSIE?

Supervised Industrial Training Scheme in Engineering.


Which of the two types of Data Independence Types is harder to achieve?

The ability to modify a scheme definition in one level without affecting a scheme definition in next higher level is called data independence there are two types of data independence physical data independence:- refers to the ability to modify the scheme followed at the physical level without affecting the scheme followed at logical level logical data independence:- refers to the ability to modify the conceptual scheme without affecting the schemes followed at view level logical independence is difficult to achieve

Related Questions

When did the Italians come to work on the Snowy Mountains Hydroelectric Scheme?

Italians were some of the many cultural groups who came to work on the Snowy Mountains Hydroelectric Scheme. The bulk of the Italians came during the 1950s.


Where is the snowy mountain scheme located?

The Snowy Mountains Scheme is located about 100 kilometres south of Canberra in New South Wales, the Snowy Mountains area.


When Did The Snowy Mountain Scheme Start?

Construction of the Snowy Mountains Hydro-electric Scheme began on 17 October 1949.


How much did the snowy mountains scheme cost?

$820 million


What are the main features of the snowy mountains scheme?

lollipops milo


What was involved in the snowy mountains scheme construction?

it was made by dog


Where did all the water go before the Snowy Mountains scheme?

Prior to the development of the Snowy River Hydro-Electric scheme, when the snow in the Snowy Mountains thawed, the water simply flowed into the rivers of New South Wales and Victoria, and then out to sea.


What role did sir William Hudson play snowy mountains scheme?

he was the first commissioner for the snowy mountain hydro


What was the role of the Snowy Mountains Scheme in post World War 2 migration?

Many migrants came from Europe to work on the scheme and most probably stayed permanently, moving on as it was completed.


When did The Snowy River Scheme start?

Also known as the Snowy Mountains Hydro-electric Scheme, construction of the Snowy River began on 17 October 1949. Planning, however, had begun many years earlier.


What are the building dates for the Snowy Hydro Scheme in Australia?

Construction of the Snowy Mountains Hydro-electric Scheme began on 17 October 1949. It took 25 years to complete, so was finished in 1974.


What are the countries that helped build the snowy mountains scheme?

Australia, New South Wales, America, built under the direction of engineer William Hudson. The Snowy Mountain Scheme was noted by its immigrant European workforce.