ewt
a day
it takes 1 day
It takes 20000 day to build an oil rig.
It all depends on the job you take. Production engineers, like those that work for chevron will work 40 hours a week like most jobs. They will report to the office like in new Orleans or Houston. Now, on a rig it is a totally different story. They will pull atleast 12 hours a day. Most over a hundred a week. Which engineers who work offshore or on a rig get paid by the hour or by the day. So, you are making the most for the time you sink in. I'm a petroleum engineering student at LSU. A few of our professor's have told us they spent 2 days up non stop sometimes. It all depends what is going on.
Onshore and offshore breezes are local winds that result from temperature differences between land and water. During the day, the land heats up faster than the ocean, causing the air above the land to rise and creating a low-pressure area; this draws cooler air from the ocean towards the land, resulting in an onshore breeze. Conversely, at night, the land cools more quickly than the water, leading to higher pressure over the land and causing the cooler air over the ocean to flow towards the land, creating an offshore breeze. These breezes are driven by the uneven heating of land and water and can influence local weather patterns.
it will normally take one day .... no it doesnt. it takes as long as it takes your body to digest food, usually about an hour or 2.
About 5 months of cycling about 20 kms a day! According to my gps I have burned 31929 calories after cycling to work every day!
A day when you can take your child to work with you if you want to you don't have to.You take your child to work.
Take your child to work day is: April 28th 2011 =)
Take your kid to work day is on November 3,2010 on Tuesday....
It was a 3 day trip... at the end of 9 years of hard work.
No. The pill is not based on time of day, but on frequency. You have to take the pill every day to have it work. It doesn't matter if you take it in the morning or the evening as long as you take it.
Take a Girl Child to Work Day was created in 2003.
when is take your child to work in 2014
Hi, you can take it anytime of day, as long as you take it the same time each day. Try to take it when you do a certain activity so you remember, like if you go to work the same time each day. I take mine at around 2pm as that's when i come in from work. If you do forget to take it, take it as soon as you remember as its better than not taking it at all, but don't ever take 2 pills on the same day, if you miss a dose you will just need to talk to your doc.
They uasally work 12 hours a day
you can work day or night as long as you do your job