Only waiting 3 days for mine to cure. Have cinder blocks filled and a smooth exterior finish. wouldnt worry about it too much after 2 days.

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

How long should concrete cure before it can be used for construction purposes?

Concrete should cure for at least 28 days before it can be used for construction purposes.


Should concrete crack within days of being poured?

It could, but it should not crack. Either the grade was not prepared properly, the concrete was used too soon, the concrete was not reinforced, it was allowed to cure too quickly, or some other problem existed.


How long should a concrete driveway cure before parking cars on it?

At least 3 days


How long does it take for a concrete driveway to cure completely?

A concrete driveway typically takes about 28 days to cure completely.


Is it safe for me to drive on concrete after 5 days of it being poured?

It is generally safe to drive on concrete after 5 days of it being poured, but it is recommended to wait at least 7 days to allow it to fully cure and strengthen.


When is green concrete considered cure?

28 days is the usual cure time for structural concrete. For street pavements and driveways made with 6-Sack concrete, 3 days of cure will support a car, but 7 to 10 days is required for it to support trucks. All concrete continues to cure forever, as long as moisture is present.


How long does it take for 6 inches of concrete to cure?

It typically takes about 24 to 48 hours for 6 inches of concrete to cure completely.


How long for bagged concrete to cure?

Concrete never fully cures, but a non-quicksetting concrete should be firm on the surface in about 4-8 hours, and usable for foot traffic or post setting in 36 hours.


When can you put weight on new concrete?

New concrete will need to cure for several days. Depending on how much weight it is going to hold, this should be postponed as many extra days as possible.


How long does it take for 4 inches of concrete to cure?

It typically takes about 28 days for 4 inches of concrete to fully cure and reach its maximum strength.


What is the minimum time concrete should cure before a load is placed on it?

I't depends on many things temperature, humidity, and so on, but you should be fine after 7 days