In an M20 concrete mix, which has a ratio of 1:1.5:3 (cement: sand: aggregates), approximately 7 to 8 bags of cement are needed for one cubic meter of concrete. This translates to about 350 to 400 kg of cement, considering a standard 50 kg bag. The exact number may vary based on factors like waste, mix adjustments, and specific project requirements.
1 bag
In M20 grade concrete, the mix ratio is typically 1:1.5:3 (cement: sand: aggregates). For one cubic meter of concrete, you generally need about 7 to 8 bags of cement, as one bag of cement is approximately 50 kg. This equates to roughly 350 kg of cement per cubic meter, which aligns with the M20 mix design requirements.
M20 - 6.20bags
M20 = 1:1.5:3 Volume = 1+1.5+3=(5.5 parts ) Total volume ingredients for using 2omm jelly =1.57 Volume of broken stone Require = (3/5.5) x 1.57 = .856 Cum Volume of sand Require = (1.5/5.5 ) x 1.57 = .471 Cum Volume of cement = (1/5.5) x 1.57 = .285 Cum = .285 x1440 = 411 kg = (8.22 bag ) For 1Cum of M20 ( 1:1.5:3 ) 20mm jelly = 0.856 cu.m sand = 0.472 cu.m cement = 8.22 bag
1:1.5:3 (cement,stone,sand)
1 bag
1 bag
For M10 (1:3:6) Grade of concrete cement bag consumed = 4.4 bags/cum M15(1:2:4) Grade of concrete cement bag consumed = 6.6 bag/cum M20(1:1.5:3) Grade of concrete cement bag consumed = 8.2 bag/cum
M20 - 6.20bags
It depends on the Grade of Concrete. general grades are M15, M20, M25 etc. here are the nos. of bag required -------------------Bag for 1 cum---------------Bag for 5 cum M15------------------- 6.4----------------------------32 M20-------------------- 8-----------------------------40 M25--------------------12----------------------------60
concrete and cement
There should not be any bricks in a bag of cement!
How many cubic meters in 1 cement bag of 50kgs
20 bag of cement equals 1 tone.
1
M20 = 1:1.5:3 Volume = 1+1.5+3=(5.5 parts ) Total volume ingredients for using 2omm jelly =1.57 Volume of broken stone Require = (3/5.5) x 1.57 = .856 Cum Volume of sand Require = (1.5/5.5 ) x 1.57 = .471 Cum Volume of cement = (1/5.5) x 1.57 = .285 Cum = .285 x1440 = 411 kg = (8.22 bag ) For 1Cum of M20 ( 1:1.5:3 ) 20mm jelly = 0.856 cu.m sand = 0.472 cu.m cement = 8.22 bag
1:1.5:3 (cement,stone,sand)