33
1 + 2 + 4 = 7divide one kg by 7then multiple each item by that answer1 part cement is 1/7 of the kg (5.0428 ounces)2 part sand is 2/7 of the kg (10.0857 ounces)4 part stone is 4/7 of the kg (20.1714 ounces)kg equals 2.205 pounds, so you are not going to make very much concrete using only one kg!
1 ounce
Wet concrete is approximately 150 pounds per cubic foot. So 80 pounds is approximately 1/50 th of a cubic yard.
1 bar = 100000 Pa1psi = 6890 Paapprox 14.5psi to the barPrecisely,1 bar =14.5037738 psipsi = pounds per square inch
Assuming you wish to used bagged 'pre-mixed' concrete, the industry standard is 1/2 cubic foot yield from a 60 pound bag. Keep in mind that the true weight will vary due to such things as sand/portland/aggregate ratios. But for a simple answer, you will be close with 3240 pounds. 60 pounds per 1/2 cubic foot, = 120 pounds for each cubic foot. 27 cubic ft. per yard 120 X 27 = 3240
11 pounds and 1 ounce.
1 Ounce=0.0625 Pounds 1 Pound= 16 Ounces
1 ounce = 0.0625 pounds 208 ounces = 13.0 pounds
4 pounds and 1 ounce is equivalent to 65 total ounces.
.83 pounds mass is equal to 13.28 ounce mass .83 pounds force is equal to 13.28 ounce force
There are 0.0625 pounds per ounce.1 ounce = 0.0625 pounds1 Ounce = 0.0625 Pounds.0625
2 & 1 fourth pounds equals how many ounces
There are 16 ounces in 1 pound.
Exactly the number of pounds in one pound.
1 ounce = 0.0625 pounds.
1/8 ounces = 3.544 grams = 0.007813 pounds
2.4 pounds. There are 16 ozs. in one pound.