It takes about over 500 people to build a turbine wowza!
Time It takes To Build Peaking Power PlantIt typically takes one to three years to build a gas turbine power plant depending on the size and complexity. A 100 MW conventional gas turbine may take about a year. A 300 MW combined cycle power plant may take about two to three years. These estimates may increase if demand for gas turbines is high.
To much to count
how long does it take to build a asimo
3,218 as evident in the San Giordano Wind Farm just outside Palm Springs Ca
I toke two years to build
how many people did it take to build the olympic stadium
It took about 456 people to build a castle
456
1000
720,000 people
it takes 79 people to build a normal sized hose
Ten
Thousands.
1 at a minimum.
127
12,000
It took over 180 people