1) weight of cement in one cube divided by density of cement = volume of cement in a cube: 2) Similarly volume of fine & Coarse aggregate can be calculated 3) Adding all one will get volume of solids in a Cube-Vs: 4) Subtracting Vs from volume of cube Vc one would get volume of voids Vv 5) taking ratio of Vv to Vs one would get void ratio


How much cement for 1 cube concrete at 5 to 1?

tell me the grade


For 1metet cube of brick work how much cement is required?

For 1 meter cube of brick work, you would need approximately 13 bags of cement.


How do you calculate the wastage in concrete?

You need to calculate the total volume of the space that the concrete has to fill. if you're doing a slab 4" thick a cu. yd. will cover 81 sq. ft. Take the total area and divide by 81 to get the number of yard needed.


How many bags of cement in one meter cube of concrete for M25 grade in nominal mix design?

10.94 bags


What causes concrete cubes 28 days strength failure?

Mainly it is because of water cement ratio(w/c ratio) Handling of cube Treatment of cube Curing


How many cube test required for 1 cubic meter concrete?

0.2


How much cube strength required for m20 concrete mix?

does not exceed 30N/mm2


How many kg of cement is required for 1 meter cube of m20 concreteand how find it?

1 bag


What is meant by 1 meter cube of concrete?

A metre cube of concrete is a volume of concrete which is equivalent to the volume of a cube each of whose sides are 1 metre long.


What is the mix ratio for each grade of concrete?

1:2:4


How much sand and gravel do you need to make 1 cubic meter of concrete?

To make 1 cubic meter of concrete, you typically need about 1.5 cubic meters of sand and gravel combined. The general ratio for mixing concrete is 1 part cement, 2 parts sand, and 3 parts gravel. Therefore, for 1 cubic meter of concrete, you would need 0.5 cubic meters of cement, 0.75 cubic meters of sand, and 0.75 cubic meters of gravel.