answersLogoWhite

0

200

User Avatar

Wiki User

13y ago

What else can I help you with?

Continue Learning about Engineering

How much fuel or energy is required to make 1kg of cement?

The production of 1 kg of cement typically requires about 0.8 to 1.0 kg of fuel, depending on the technology and process used. This energy consumption translates to approximately 3 to 4.5 MJ (megajoules) of energy per kilogram of cement produced. The energy mainly comes from burning fossil fuels, such as coal or natural gas, during the clinker production phase. Additionally, the energy required can vary based on factors like the type of cement and the efficiency of the manufacturing process.


How much pressure does it take to make cement crack?

That depends on the thickness of the cement, the strength of the cement, the age of it, Is it reinforced


What does yield mean in cement?

In the context of cement, "yield" refers to the amount of concrete or mortar that can be produced from a specific quantity of cement. It is an important measure for determining the efficiency of a mix design and how much final product can be obtained per unit of cement used. Yield can be influenced by factors such as the water-cement ratio, the type of aggregates, and the inclusion of additives. Proper yield calculations are essential for cost estimation and project planning in construction.


How much does it cist to lady a driveway with cement?

Cementing a driveway can cost anywhere from 200 dollars to 2,000 dollars. It all depends on the company you go with and how bug your driveway is.


How much water is required in 1 bags of cement?

it depends on the type of mix and water cement ratio.