The Guardian newspaper says it costs £1 billion. See the related link.
It is estimated a new nuclear plant built today in the US would cost $10-12 billion for a 1500-1600 MW plant. Then once you have the plant built, one load of fuel bundles would cost approx. $150 to $200 million.
The cost to start up a nuclear power plant can range widely, typically between $6 billion to $9 billion per gigawatt of electrical capacity. Factors influencing this cost include location, regulatory requirements, technology used, and construction timelines. Additionally, financing, operational costs, and decommissioning expenses can significantly impact the overall investment required. Overall, the total cost for a new nuclear facility can exceed $10 billion, depending on specific circumstances.
That is impossible to answer. There are many kinds of chemical energy and each costs a different amount. AA batteries are chemical energy. A car battery is chemical energy. Gasoline is chemical energy. Food is chemical energy.
The cost of constructing a nuclear power plant can vary widely, typically ranging from $6 billion to $9 billion or more per reactor, depending on factors such as location, regulatory requirements, and technology used. Some recent projects have reported costs exceeding $10 billion due to delays and budget overruns. Additionally, ongoing operational and maintenance expenses contribute to the overall financial considerations of nuclear energy production.
1,000,000,000,000
10 billion dollars
12 billion
to much
Around 15,000,000,000
$14,000,000,000 was spent to clean up the oil
14,000,000,000
BP has already spent $450m on drilling relief wells, preparing the clean-up and giving grants to states; it has promised to pay all "legitimate" damages.
To clean soda spill on carpet, blot up as much liquid as possible with a clean cloth or paper towel. Mix a solution of warm water and detergent, and gently blot the stain using a clean cloth. Rinse the area with clean water and blot dry.
(For BP) As of August 10th 6.1 billion US. This includescompensation for individuals and companies affected, clean-up, containment and federal costs.Hope this helps :)
The Torrey Canyon oil spill clean-up in 1967 cost around £6 million, which is about $16 million in today's currency. The operation involved a range of methods, including oil dispersants, beach cleaning, and controlled burning.
http://americanhistory.si.edu/subs/history/timeline/cost/index.html
40 bucks