alot:)
100 million , get the people the land, training.
Kudankulam Nuclear Powerplant is designed to produce 2000 Mega Watts. But can extract up to 4000 Mega Watts at maximum capacity.
It is estimated a new nuclear plant built today in the US would cost $10-12 billion for a 1500-1600 MW plant. Then once you have the plant built, one load of fuel bundles would cost approx. $150 to $200 million.
define green....... anything like a solar panel or a windmill...yes. But like a power plant no it costs way to much to burn or incinerate anything to make energy...unless you consider a nuclear power plant green.
The cost of maintaining a nuclear power plant can vary significantly depending on factors such as the age and size of the plant, the specific technology used, regulatory requirements, and ongoing maintenance needs. Generally, maintenance costs for a nuclear power plant can range from tens of millions to hundreds of millions of dollars annually. These costs typically include expenses for staffing, equipment maintenance, safety inspections, regulatory compliance, and long-term waste management. It is important for operators to budget and plan for these ongoing maintenance costs to ensure the safe and efficient operation of the plant.
Not really. You receive 100 times as much radiation from coal power plant pollution than you do from nuclear power plant leaks.
The power output of a nuclear power plant can vary, but on average, a typical nuclear power plant can produce around 1,000 megawatts of electricity. This is enough to power roughly 1 million homes.
Up to 1500MWe per reactor
123412
1 plant takes 30million dollares
Depending on: - the type of the nuclear reactor - the electrical power of the nuclear reactor - the type of the nuclear fuel - the enrichment of uranium - the estimated burnup of the nuclear fuel etc.
This depends on the type and power of the reactor; say tens of metric tons.
The amount of energy produced by a nuclear power plant in an hour can vary depending on its size and capacity. On average, a nuclear power plant can produce around 1,000 to 1,500 megawatt-hours of electricity per hour.
See the link given below
If a nuclear power plant were to be decommissioned or shut down, the costs for decommissioning and managing the spent nuclear fuel can run into billions of dollars. These costs are typically factored into the overall cost of nuclear energy production and are often covered by a decommissioning fund that the plant operator is required to establish during the operation of the plant.
Nuclear power plants, on average, can generate around 1,000 megawatts of electricity, which is enough to power a city of about 800,000 to 1 million people. The total electricity output of a nuclear power plant will vary depending on factors like the plant's size, design, and operational efficiency.
Only the wildlife that used the power plant site before it was built