answersLogoWhite

0

What else can I help you with?

Continue Learning about Engineering

How much cement required 1 cubic meter m10 grade concrete?

To calculate the amount of cement required for 1 cubic meter of M10 grade concrete, which has a mix ratio of 1:3:6 (Cement: Sand: Aggregate), you can use the following formula. The total parts of the mix are 1 + 3 + 6 = 10 parts. For 1 cubic meter, the volume of cement required is approximately 1/10 of the total volume, which is about 0.1 cubic meters. Given that the density of cement is around 1440 kg/m³, you would need approximately 144 kg of cement for 1 cubic meter of M10 concrete.


How much sand is required for one cubic meter of concrete for slab?

For one cubic meter of concrete used in a slab, approximately 0.3 to 0.5 cubic meters of sand is typically required, depending on the specific mix design. A common concrete mix ratio for slabs is 1:2:4 (cement:sand:aggregate), which translates to about 0.4 cubic meters of sand for each cubic meter of concrete. However, the exact amount may vary based on the desired strength and workability of the concrete.


How many tonnes of coarse aggregate make cubic meter?

The weight of coarse aggregate required to fill one cubic meter depends on its density, which typically ranges from 1,500 to 2,500 kilograms per cubic meter. Therefore, one cubic meter of coarse aggregate generally weighs between 1.5 to 2.5 tonnes. For example, if using a density of 2,000 kg/m³, one cubic meter would equal 2 tonnes. Always check the specific density of the material being used for accurate calculations.


How much sand and aggregate required 1 cubic meter of M30 grade cement?

Type your answer here... 11.2


What is number of bags of cement required foe 1 cubic meter of M20 grade cement concrete?

M20 - 6.20bags