answersLogoWhite

0

1-3 days for driveway or deck depending on thickness.

For a pool you may need to water multiple times a day for 1-2 weeks

User Avatar

Wiki User

13y ago

What else can I help you with?

Continue Learning about Engineering

Can i pour dry concrete in a hole?

Yes you can. There is a special concrete formula made by sackrete that you just add water to the concrete after pouring it in a hole.


How dry must the ground be before pouring concrete?

Before pouring concrete, the ground should be sufficiently dry to prevent excess moisture from affecting the curing process. Ideally, the soil moisture content should be below 10%, and any standing water or muddy conditions should be avoided. This ensures proper adhesion and reduces the risk of cracking or weakening the concrete. Always check local guidelines and conditions, as they may vary.


How long after pouring concrete can it get wet?

Concrete should ideally be kept dry for at least the first 24 to 48 hours after pouring to ensure proper curing and strength development. However, it can begin to withstand light moisture exposure after about 12 hours, depending on environmental conditions. For optimal results, it’s best to wait a week before subjecting it to significant water exposure. Always consult specific guidelines for the type of concrete mix used.


Make sentences with the word pouring?

the boy is pouring water away the rain is pouring down


How long must concrete dry before it rains on it?

First of all, concrete does not "dry" to become hard. It cures, which is a chemical interaction between its water and its portland cement. Usually, a couple of hours is plenty of time for concrete to 'set' enough to not be damaged by rain. The best and strongest concrete never dries out for the first 28 days from pouring it.

Related Questions

Does dry pouring concrete work effectively for construction projects?

Dry pouring concrete, also known as dry mix concrete, is not typically recommended for construction projects as it can lead to weaker and less durable structures. Wet pouring concrete, where water is added to the mix before pouring, is the preferred method as it ensures proper hydration and strength of the concrete.


Can i pour dry concrete in a hole?

Yes you can. There is a special concrete formula made by sackrete that you just add water to the concrete after pouring it in a hole.


How dry must the ground be before pouring concrete?

Before pouring concrete, the ground should be sufficiently dry to prevent excess moisture from affecting the curing process. Ideally, the soil moisture content should be below 10%, and any standing water or muddy conditions should be avoided. This ensures proper adhesion and reduces the risk of cracking or weakening the concrete. Always check local guidelines and conditions, as they may vary.


When pouring concrete in the winter months what is added to heat up the concrete?

When pouring concrete in winter months, accelerators such as calcium chloride are often added to the mix to promote hydration and speed up the curing process. Additionally, warm water can be used instead of cold, and heated enclosures or blankets may be employed to maintain optimal temperatures, preventing the concrete from freezing. These measures help ensure that the concrete cures properly despite colder conditions.


What are the essential steps to consider when pouring concrete for a new construction project?

The essential steps to consider when pouring concrete for a new construction project include preparing the site by leveling and compacting the ground, setting up the formwork to shape the concrete, ensuring proper reinforcement is in place, mixing the concrete correctly with the right proportions of water and cement, pouring the concrete evenly and smoothly, and finishing the surface with tools to achieve the desired texture and appearance.


What is The difference between pouring water on the road and pouring it in a tiled classroom?

pouring water on the tiles is more dangerous than pouring water outside on the road and as such one should try as much to always clean up the ground of a tiled place before it becomes hazardous.


How long after pouring concrete can it get wet?

Concrete should ideally be kept dry for at least the first 24 to 48 hours after pouring to ensure proper curing and strength development. However, it can begin to withstand light moisture exposure after about 12 hours, depending on environmental conditions. For optimal results, it’s best to wait a week before subjecting it to significant water exposure. Always consult specific guidelines for the type of concrete mix used.


PH of water for making concrete?

The pH of water for making concrete is 6 to 8.The water should be free from organic matters.Sea water should not be used for making concrete.Potable water is used for making concrete.


Is a Aquarius represented by a mermaid?

Aquarius is the water carrier. Often represented by a woman (sometimes a man) pouring water from a jug.


Make sentences with the word pouring?

the boy is pouring water away the rain is pouring down


What is 'pouring water' in French?

It would help to have some context, but the exact translation of "pouring water" is versant de l'eau.I am pouring water = Je verse de l'eau


Can you pour concrete on 0 degrees Fahrenheit?

Pouring concrete at 0 degrees Fahrenheit is not recommended. Concrete needs a minimum temperature of around 40 degrees Fahrenheit to properly cure and gain strength. At colder temperatures, the water in the concrete mixture can freeze, leading to weakened concrete with reduced durability. It is advisable to wait for warmer weather to pour concrete for optimal results.