Mechanical engineers aren't the best source for answering manufacturing questions. Takt time is a function of total available time for production and production demand. Example: If you have 100 minutes available for production per day and your need is to produce 100 pieces per day, your takt time would be 1 minute. If you need 200 pieces per day, then your takt time would be .5 minutes. In other words, you need to produce a part every 30 seconds to make the plan.

User Avatar

Wiki User

16y ago

What else can I help you with?

Continue Learning about Engineering

What are the recent trends in operations management?

Recent Trends In POM  Global Competition  Operations Strategy  Flexibility  Cycle Time Reduction  Business Process Re-engineering  Supply Chain Management  Workers Involvement  Lean Manufacturing  TQM  Global Competition  Global Market  Global Suppliers  Operations Strategy  Quality based  Time based  Flexibility  Variety of products  High Volume as well as Low Volume  Cycle Time Reduction  The less time RM (Raw Material), WIP (Work In Process), FG (Finished Goods) spend in the Manufacturing and Logistics process, the less opportunity they have to absorb costs.  Business Process Re-engineering  Value added and NVA activities  Supply Chain Management  NOT from RM storage to FG warehouse  From the original suppliers to final consumers  Workers Involvement  Workers are not costs, they are assets  Lean Manufacturing  Inventory is waste Total Quality Management


What made the transition from one a a time manufacturing to mass production possible?

coal


What is the frequency of a signal which has a cycle time of 100 microseconds?

the frequency is 1 divided by the cycle time, or 1/100 microseconds = 10,000 cycles per second


The length of time between a point in one cycle and the same point in the next cycle of an ac wave is the?

this is called time period of the wave. it is also the inverse of frequency of wave.


What is the phase of a sine wave which is offset one sixth of a cycle with respect to time zero?

1/6th of a cycle is 60 degrees or (pi/3) radians.

Related Questions

What is manufacturing cycle efficiency?

Manufacturing Cycle Efficiency is value add (VA) time divided by non-value add(NVA) time. That is, in the entirety of a process flow or value stream flow, the total of value added time divided by the total of non-value added time. For example, total manufacturing cycle time of 28 days. Of the total, let's say there is 1 day worth of VA time and 27 days of NVA time. That means your cycle efficiency comes to 3.7%.


Does in line manufacturing output is decided by work station at which cycle time is least?

you give answer.......


What is the takt time used for?

Takt time comes from the german word Taktzeit. Takzeit means cycle time. Takt time is used for industrial manufacturing lines. Takt time is put into a mathematical expression to express the cycle time.


What is difference between lead time and cycle time?

Lead time is typically used to specify how long the delivery of a piece of equipment will take from purchase order to delivery. Cycle time is the amount of time measured in seconds or minutes a piece of equipment operates at. This is measured from the start of one cycle to the start of the next cycle.


What is the water cycle in a short term?

the water vapor takes a short time


What is cycle time in manufacturing operations?

It is the time, which is taken by a normal worker for a specific task or job, working under moderate conditions and includes other allowances such as fatigue, setting of tool and job, repairing of tool, checking of job etc.


Just-in-time manufacturing is a production system that pulls products through the manufacturing process on the basis of market demand?

Just-in-time manufacturing is a production system that pulls products through the manufacturing process on the basis of market demand.


What are the three parts of the time cycle?

What are the 3 parts of the time cycle


What are the various methods for assessing working capital requirements?

conventional method:according to the conventional method,cash inflows and outflows are matched with each other. operating cycle method:the duration of time required to complete the following sequehces of events,in case of manufacturing firms is called the operating cycle


H0w Manufacturing Cycle Efficiency is measured?

MCE =value added time (process time)/throughput time. Basically this breaks down to the time spent actually working on the product divided by the time spent working on the product, time spent on inspecting the product, time spent on moving the product and time a product spend waiting to be worked on.


What is CPU cycle time?

The CPU cycle time is the time between start up and shutdown


What is a Mes code?

A MES code, or Manufacturing Execution System code, refers to a unique identifier used within manufacturing environments to track and manage production processes in real-time. It helps in monitoring the workflow, managing resources, and ensuring quality control throughout the manufacturing cycle. MES codes facilitate communication between different systems and enable efficient data analysis for operational improvements.