It is nowadays used in Malls , shopping Complexes as a purpose for thermometric billing ,It measures the Quantum of Heat that is Used by the respective shop getting Chilled water supply to its AHU/FCU from a Centrally placed Water Chilling Unit (CHiller) which the owner of building has placed.
It is like an electricity Consumption meter In this case measuring Heat in BTU
Regards
Rakesh Baurai
http://sankrantee.blogspot.com
Yes
depends on the cooling required ex:-suppose if cooling upto 20c is required the area cooled will be higher as compared to cool upto 15c...........
joule seconds or newton meter seconds depending on what system you use
The cost of this installation will vary greatly around the world. Get an estimate from your local contractor in your area. You will need to have the voltage and amperage of the service that you want to have installed.
It makes no difference as to what system is being monitored. The meter itself has to be accurate because it comes under the government's weights and measures department. Meters in the field are checked if the consumer thinks there is a problem with their billing. Before a meter is put into service they are all checked for accuracy by an independent agency.
The various tests that are made before the installation of an energy meter are completed to ensure the safety and accuracy of the meter. These tests include EMC, vibration and core meter accuracy testing.
i dunna??
Gas meter installation involves several steps. First, the location for the meter is determined and approved by the gas company. Next, the gas line is connected to the meter and tested for leaks. The meter is then mounted securely and connected to the gas line. Finally, the meter is activated and tested to ensure accurate readings.
It depends on the materials used, the location and the type of installation required.
The purpose of a gas meter is to monitor how much gas a particular house is using. Customers are then billed according to how much gas they have used from the meter.
The meter constant represents the number of pulses will generated per hour nothing but after n number of pulses the meter reading is incremented by one.Read more: What_is_the_meter_constant_of_energy_meterAnswerAn energy meter measures the quantity of energy used by an installation. It does this, by monitoring the supply voltage and the in-phase component of the installation's load current.
A Square D meter main for residential electrical systems combines the functions of a meter socket and a main breaker panel in one unit. This helps to streamline the installation process and save space. The key features include a built-in meter socket, main breaker, and branch circuit breakers. The benefits include easier installation, space-saving design, and improved safety and reliability for the electrical system.
A 200 amp meter pan is designed to handle up to 200 amps of electrical current. It is a component of the electrical system that measures and monitors the amount of electricity being used in a building. The specifications for a 200 amp meter pan include its size, material, and installation requirements. Having the correct size and type of meter pan is important for ensuring the safe and efficient operation of the electrical system in a building.
The purpose of installing a BTU meter in LPG (liquefied petroleum gas) systems is to measure the energy content of the gas being consumed. This allows for accurate billing based on the actual energy consumed rather than just the volume of gas. It also helps in monitoring energy usage and identifying potential efficiency improvements.
The purpose of a 320 amp meter base with 2 200 amp disconnects in an electrical system is to accurately measure and control the flow of electricity entering a building. The 320 amp meter base measures the total electricity usage, while the 200 amp disconnects allow for safe disconnection of power in case of maintenance or emergencies.
One meter in the metric system is equivalent to approximately 3.28 feet in the customary system.
Whether you have an overhead or underground feed, that section of the installation is referred to as Service Entrance Conductors. On an overhead installation, it includes the conductors on BOTH sides of the meter, from the service drop conductors (attached at the service head) to the service equipment LINE terminals. On an underground installation, it refers only to the conductors between the meter's LOAD side and the service equipment LINE terminals. The conductors on the LINE side of the meter come from a distribution transformer and are unbroken between the transformer and your meter.