M-15 grade concrete, which has a compressive strength of 15 MPa, is typically used for non-structural applications. It is suitable for use in plain concrete works such as footing for small structures, floor slabs, and pavements in areas with low load-bearing requirements. Additionally, it is often employed in the construction of drains, culverts, and other minor structures where high strength is not critical. However, it is not recommended for load-bearing structures or locations subject to heavy loads.

User Avatar

AnswerBot

1mo ago

What else can I help you with?

Related Questions

What is the ratio of M15 grade of concrete?

1:2:4


What is M15 grade?

Ans: M15 grade indicates the grade of concrete used in the structure i.e M indicates the design mix proporation and 15 indicates the compressive strength of conctrete at 28 days in N/mm2


How many bags cement to make 1 cubic meter of M15 grade cement concrete?

15 milligrams


What is the reliabily of results OF testing in situ concrete m15 grade concrete lining of 75 mm thick?

It depends who is doing the testing and what tests are carried out.


What is the grade of concrete for various concrete proportion?

The grade of concrete for various concrete proportions areM10 - 1:3:6 (Cement:Fine aggregate:Coarse aggregate)M15 - 1:2:4M20 - 1:1.5:3M25 - 1:1:2


What is M20 concrete grade?

M20 refers to the grade of the concrete generally used in construction purpose. Here, M refers to mix & number 20 refers to the characteristic strength of concrete. the proportions of this grade is (1:1 1/2: 3). Along with this there are some more grades used in constructions i.e., M5, M7.5, M10, M15, M25, M30................. M80


How do you calculate number of bags of cement required for 1 cubic meter of m15 grade cement concrete as per Indian standard code?

To calculate the number of bags of cement required for 1 cubic meter of M15 grade concrete, first determine the mix ratio, which is typically 1:2:4 (Cement:Sand:Aggregate). For M15 concrete, approximately 1 part cement is needed for every 7.5 parts of total volume (1 + 2 + 4 = 7). Given that one bag of cement weighs 50 kg and has a volume of about 0.035 cubic meters, you would need around 7.5 bags of cement for 1 cubic meter of M15 concrete.


What are the cement content for M15 gread?

The M15 grade of concrete typically has a mix ratio of 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts coarse aggregate. The cement content for M15 concrete is generally around 240 kg per cubic meter of concrete. However, this can vary based on specific project requirements and local practices. Always consult relevant standards and guidelines for precise specifications.


How do you mix M15 Concrete?

1:2:4


What is the compressive strength of M15 concrete at 28 days?

15


What is the ratio of concrete grades of M15?

1:2:4


How many bags of cement in a cubic meter?

For M10 (1:3:6) Grade of concrete cement bag consumed = 4.4 bags/cum M15(1:2:4) Grade of concrete cement bag consumed = 6.6 bag/cum M20(1:1.5:3) Grade of concrete cement bag consumed = 8.2 bag/cum