Ans: M15 grade indicates the grade of concrete used in the structure i.e M indicates the design mix proporation and 15 indicates the compressive strength of conctrete at 28 days in N/mm2

User Avatar

Wiki User

16y ago

What else can I help you with?

Related Questions

What is the ratio of M15 grade of concrete?

1:2:4


How many bags cement to make 1 cubic meter of M15 grade cement concrete?

15 milligrams


What is the reliabily of results OF testing in situ concrete m15 grade concrete lining of 75 mm thick?

It depends who is doing the testing and what tests are carried out.


How do you calculate number of bags of cement required for 1 cubic meter of m15 grade cement concrete as per Indian standard code?

To calculate the number of bags of cement required for 1 cubic meter of M15 grade concrete, first determine the mix ratio, which is typically 1:2:4 (Cement:Sand:Aggregate). For M15 concrete, approximately 1 part cement is needed for every 7.5 parts of total volume (1 + 2 + 4 = 7). Given that one bag of cement weighs 50 kg and has a volume of about 0.035 cubic meters, you would need around 7.5 bags of cement for 1 cubic meter of M15 concrete.


What is the grade of concrete for various concrete proportion?

The grade of concrete for various concrete proportions areM10 - 1:3:6 (Cement:Fine aggregate:Coarse aggregate)M15 - 1:2:4M20 - 1:1.5:3M25 - 1:1:2


The number of cement bags needed to build five cubic meter?

It depends on the Grade of Concrete. general grades are M15, M20, M25 etc. here are the nos. of bag required -------------------Bag for 1 cum---------------Bag for 5 cum M15------------------- 6.4----------------------------32 M20-------------------- 8-----------------------------40 M25--------------------12----------------------------60


What are the cement content for M15 gread?

The M15 grade of concrete typically has a mix ratio of 1:2:4, which means 1 part cement, 2 parts sand, and 4 parts coarse aggregate. The cement content for M15 concrete is generally around 240 kg per cubic meter of concrete. However, this can vary based on specific project requirements and local practices. Always consult relevant standards and guidelines for precise specifications.


How does an m15 gun operated?

Which M15 (be specific), if you are talking about the M14 variant i.e M14E2/M14A1; it is the same a a regular M14.


What is the number of bags of cement required for 1 cubic meter of M15 grade cement concrete?

M 15 grade proportion - 1:2:4 (cement:FA:CA)Cement required in kgs - 325 kg per cu.mNo. of bags required - 6.50


How do you mix M15 Concrete?

1:2:4


Is there an M15 plus verson of Ong Bak?

Yes there is


How many bags of cement in a cubic meter?

For M10 (1:3:6) Grade of concrete cement bag consumed = 4.4 bags/cum M15(1:2:4) Grade of concrete cement bag consumed = 6.6 bag/cum M20(1:1.5:3) Grade of concrete cement bag consumed = 8.2 bag/cum