30
7 cement bags per 1 cubic meter of concrete......
Daft question really! Should be what is the density of cement. Does the question mean cement ( dry powder), wet concrete, set concrete or what?
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
15 milligrams
M20 - 6.20bags
4.50/bag cement, required for 1 cubic metre of concrete ( M10).
5,000,000 barrels of cement were used to make the 4,300,000 cubic yards of concrete required.
To calculate the amount of cement required for 1 cubic meter of M10 grade concrete, which has a mix ratio of 1:3:6 (Cement: Sand: Aggregate), you can use the following formula. The total parts of the mix are 1 + 3 + 6 = 10 parts. For 1 cubic meter, the volume of cement required is approximately 1/10 of the total volume, which is about 0.1 cubic meters. Given that the density of cement is around 1440 kg/m³, you would need approximately 144 kg of cement for 1 cubic meter of M10 concrete.
30
For M25 grade concrete, the mix proportion is typically 1:1:2 (cement:sand:aggregate). This means for 1 cubic meter of concrete, you would need 1/4 cubic meter of cement. As 1 cubic meter is equivalent to 35.32 cubic feet, and one bag of cement usually covers around 0.035 cubic meters, you would need approximately 7-8 bags of cement for 1 cubic meter of M25 grade concrete.
7 cement bags per 1 cubic meter of concrete......
To determine how many 50 kg cement bags are required for 1 cubic meter of Grade 30 concrete, we need to break down the mix ratio and calculate the cement content based on that. Grade 30 Concrete Mix Ratio Grade 30 concrete typically has a mix ratio of 1:2:3 (Cement: Sand: Aggregate) by volume. This means: 1 part cement 2 parts sand 3 parts aggregate (gravel) However, the actual proportion of cement required can vary slightly depending on the specific mix design used by a contractor or engineer. For standard Grade 30 concrete, the cement content is typically around 350 to 400 kg per cubic meter. Since each cement bag weighs 50 kg, the number of bags required for 1 cubic meter of Grade 30 concrete would be: Number of bags = 350 kg / 50 kg = 7 bags
147 cubic feet of cement are required.
To calculate the number of cement bags required for 1 cubic meter (m³) of concrete, you typically need about 300 kg of cement for standard concrete mixes. Since a standard cement bag weighs 50 kg, you would require approximately 6 bags of cement to make 1 m³ of concrete. However, the exact amount may vary based on the specific mix design and project requirements.
To determine the amount of cement needed for a concrete slab covering 3,200 square feet, you first need to decide on the thickness of the slab. For example, a typical thickness is 4 inches (0.33 feet). The volume of concrete required would be 3,200 sq ft × 0.33 ft = 1,056 cubic feet. Since concrete is typically composed of about 10-15% cement by volume, you would need approximately 106 to 158 cubic feet of cement, which translates to roughly 3.9 to 5.9 cubic yards of cement.
About 24 cubic yards of cement is required for a slab that size.