answersLogoWhite

0

What else can I help you with?

Continue Learning about Engineering

What are the four main systems of a drilling rig?

The four main systems of a drilling rig are the drilling system, power system, circulating system, and well control system. The drilling system includes components for drilling the well, such as the drill bit and drilling string. The power system provides the necessary energy to operate the rig, including engines and generators. The circulating system manages the flow of drilling fluid, while the well control system ensures safety by managing pressure and preventing blowouts.


Which one of the following hot water storage systems installations is likely to require the most pipework and fittings?

A centralised hot water storage system is likely to require the most pipework and fittings. This system typically involves a large storage tank located in a central area, necessitating extensive piping to distribute hot water to multiple outlets throughout the building. In contrast, individual or point-of-use systems generally have shorter pipe runs, resulting in less complexity and fewer fittings.


Why do you use a vacuum pump on an air conditioning unit?

They are used when installing, to ensure there is no air or moisture in the pipework. On large industrial and commercial systems a sight glass may also be installed so the presence of moisture can be constantly checked for.


What is qualification and resposnsibility of system analyst?

The qualification of a system analyst is having postgraduate degree in IT fields and computer systems. Their responsibility is to evaluate and monitor systems so as to offer guidance on any possible challenges in the system.


What the purpose of pipe work insulation material is?

The purpose of pipework insulation material is to reduce heat loss or gain in piping systems, thereby improving energy efficiency. It helps maintain the desired temperature of the fluids within the pipes, preventing condensation and protecting against corrosion. Additionally, insulation can enhance safety by reducing the risk of burns from hot surfaces and minimizing noise from fluid flow. Overall, it contributes to the longevity and performance of piping systems.

Related Questions

What covers the design of sanitry pipework systems is it building regulations?

I think it's your local (and national) Plumbing code.


What are the advantages of using plastic pipework in plumbing systems?

Plastic pipework in plumbing systems offers advantages such as being lightweight, easy to install, resistant to corrosion, and cost-effective compared to traditional metal pipes. Additionally, plastic pipes are durable, have smooth interiors that reduce clogs, and are less likely to burst in freezing temperatures.


What does ABS class notation CDS mean?

This non-mandatory notation is assigned to indicate that drilling systems and equipment comply with the ABS Guide for the Certification of Drilling Systems. The symbol À will be omitted if the drilling systems and equipment, although complying with the Guide, have not been manufactured and installed under survey to ABS.


Where can I find information on well drilling and drilling supplies for a new water well?

Americawestdrillingsupply.com is a great online webstore and resource center for all things drilling. The website has tech charts, drilling systems, and rentals.


What are the four main systems of a drilling rig?

The four main systems of a drilling rig are the drilling system, power system, circulating system, and well control system. The drilling system includes components for drilling the well, such as the drill bit and drilling string. The power system provides the necessary energy to operate the rig, including engines and generators. The circulating system manages the flow of drilling fluid, while the well control system ensures safety by managing pressure and preventing blowouts.


What jobs are in the Rocky Mountains?

Mineral and exploration drilling, communication systems upkeep and installation etc...


What is HCR in drilling rig?

HCR, or High-Pressure Control Room, in a drilling rig refers to a specialized area where operators monitor and control drilling operations, particularly those involving high-pressure systems. It is equipped with advanced technology to ensure safety and efficiency, managing pressure systems and preventing blowouts. The HCR is crucial for real-time decision-making and maintaining optimal drilling performance while adhering to safety protocols.


Can bronze be used for pipework?

Yes, bronze can be used for pipework, particularly in applications involving water and gas systems. Its corrosion resistance and durability make it suitable for plumbing, heating, and marine environments. However, it is generally more expensive than other materials like copper or PVC, so its use is often reserved for specific applications where its properties are advantageous.


Which one of the following hot water storage systems installations is likely to require the most pipework and fittings?

A centralised hot water storage system is likely to require the most pipework and fittings. This system typically involves a large storage tank located in a central area, necessitating extensive piping to distribute hot water to multiple outlets throughout the building. In contrast, individual or point-of-use systems generally have shorter pipe runs, resulting in less complexity and fewer fittings.


What year did halliburton purchase sperry sun?

Halliburton purchased Sperry-Sun in 1994. This acquisition was part of Halliburton's strategy to expand its services in the oilfield industry, particularly in drilling technology and services. Sperry-Sun was known for its advancements in drilling systems and measurement-while-drilling technology.


What has the author Guillaume J J Ducard written?

Guillaume J. J. Ducard has written: 'Fault-tolerant flight control and guidance systems' -- subject(s): Drone aircraft, Guidance systems (Flight)


What guidance gives specific information on grounding systems?

Afi 32-1065