A Material Takeoff is the process of analyzing(this includes list of materials with quantities and types,grades of materials and the weights of such materials) drawings and determining all the materials required to complete the design. A Bill of Materials is adocument that shows detailed desgriptions of materials used in completing a project,this includes,types of materials,specification of each item,gost of each item used,number and cost of labour used in completing the poject. The major difference between the two is:MTO is needed to make a BOM,a BOM aids in the procurement and requisition of materials.


How many electrons are required to complete the outer energy level of a phosphorous atom?

Phosphorous has 5 valence electrons. So, you need 3 more to complete it.


What checks need to be carried out to ensure all materials required are correct and complete prior to undertaking the activity?

This would obviously depend on the activity you are about to undertake. Generic advice will be the only option available - but may well provide some obvious ideas. First of all - THINK your way through the task ahead, including every step. Mime it using the equipment if it helps. If at any point you need to switch the equipment on to find out the effect, do so. Naturally, this advice will be fine if you are about to carry out the task of preparing food or putting up a picture. Not so good if you are about to do a skydive.


What is a list of supplies needed for an experiment called?

A list of supplies needed for an experiment is commonly referred to as a "materials list" or "materials required." This list outlines all the items, equipment, and substances necessary to conduct the experiment successfully. It helps ensure that researchers have everything they need before starting the experiment.


Define Quantitative structural activity relationship?

Quantitative structure-activity relationship (QSAR)(sometimes QSPR: quantitative structure-property relationship)QSAR is the process by which chemical structure is quantitatively correlated with a well defined process, such as biological activity or chemical reactivity.For example, biological activity can be expressed quantitatively as in the concentration of a substance required to give a certain biological response. Additionally, when physicochemical properties or structures are expressed by numbers, one can form a mathematical relationship, or quantitative structure-activity relationship, between the two. The mathematical expression can then be used to predict the biological response of other chemical structures.http://en.wikipedia.org/wiki/Quantitative_structure-activity_relationship

Related Questions

What checks can be carried out to ensure that all materials required are correct and complete prior undertaking activity?

To ensure that all materials required are correct and complete before undertaking an activity, a thorough inventory check can be performed to match the materials against a predefined list. Cross-referencing with project specifications and requirements is essential to confirm that all items meet necessary standards. Additionally, conducting a visual inspection of the materials can help identify any discrepancies or damages. Finally, engaging team members in a checklist review can promote accountability and ensure that nothing is overlooked.


What checks to be carried out to ensure that all materials are correct?

Firstly analyze the job at hand and check that all materials are all there and are the right all the right sizes. Then check that the materials/parts are in good working order and have not been damaged in anyway.


What action should be taken if materials do not meet the requirements if the activity?

If the materials are unsuitable, counterfeit, or in an unusable state they should either be discarded or returned to the supplier. Materials that are not correct should not be used, even if they are similar to what is required.


What action should be taken if the materials do not meet the requirements of the activity?

If the materials are unsuitable, counterfeit, or in an unusable state they should either be discarded or returned to the supplier. Materials that are not correct should not be used, even if they are similar to what is required.


Explain the difference between activity duration estimating and estimating the effort required to perform an activity?

Activity duration estimating involves determining the amount of time an activity will take to complete, considering factors like resources, dependencies, and constraints. Estimating the effort required to perform an activity, on the other hand, focuses on quantifying the work or labor needed to complete the activity, taking into account skill levels, complexity, and potential risks. In essence, duration estimating is about time, while effort estimating is about the work involved.


What information and documentation are required to confirm the activity has been completed?

Sign off job card/work instruction sheet as complete.


What is required for life activity?

Oxygen, water, and life is required for life activity. Also ap-ma-spere<-(i couldn't spell it) is required, maybe...


What degree is required before undertaking a Masters degree?

A Bachelors degree is required prior to a Masters


What is required for sperm activity?

puberty.


How do you plan a project?

To plan a project you need to: 1. breakdown the scope, by listing all of the activities and deliverables required to complete the project. 2. map out in what order each activity needs to happen. 3. estimate the effort to complete each activity. 4. allocate resources (people or machinery) needs for each activity. Related links contains a guide to how to plan your project.


Why do you need to fill out a waiver of liability form?

A person may be required to fill out a waiver of liability form for several reasons. The waiver of liability generally protects an individual or business against legal risk, and asks the individual filling out the form to accept their own risks for undertaking a certain activity.


What checks do you need to carry out to make sure all materials required are correct and complete?

Firstly analyze the job at hand and check that all materials are all there and are the right all the right sizes. Then check that the materials/parts are in good working order and have not been damaged in anyway.