It could, but unless it's extremely uneaven (like natural slate) just lay down the pad and install the floor.

Above all, read the instructions that come with the floor.

User Avatar

Wiki User

17y ago

What else can I help you with?

Continue Learning about Geometry

Can you use leveling compound on an existing tile floor?

No


What happens when installed ceramic tile is not level?

you can hide some leveling issues with the grout, but if it's really noticeable then the surface wasn't leveled out first (self-leveling concrete) or the person laying the tile didn't know what he was doing. the good thing about tile is that you can chip out the bad area, reset new tile and re-grout to fix it. you don't have to tear out the whole room or counter


How do you find the elevation of a point?

(Another contributor wrote:)Introduction :To find the elevation of any point we have a some way one of them is closed level circuit , which in this way we can cheCk our result .And we can apply this method in the place that we cannot find difference elevation between them by sample leveling because of the distance between the points and their large difference elevation of the points .to the sighting distances between the two points is to great for the leveling staff to be read , because the sighting distance from instrument to staff is depending upon the purpose of leveling and the required accuracy . in ordinary leveling operation the maximum length of sight should not exceed about (75 m).for precise leveling with the engineer is level , sights should be limited to about (30-50)m.In this way we must divide the distance between the two main points in two some station and detect the middle of any section two setting up the level instrument at these place .The only difference point between first and second type of closed leveling is that here , his not equal to zero and it is equal to the difference of elevation of first and end point of the line so at the first type.Aim of the test1. to determine the elevation of the point from a known point elevation .2. checking the the elevation of the first point .3. find the height of the point by a large accuracy and repair reading error .Advantages1. at applying any method of leveling we cannot finish the process without making mistakes ,so this way help us to reduce this mistakes by starting the process from a point which its elevation is known and ending the process at the point .2. we can calculate the difference elevation between two points that their distance is greater than tha allowable distance that we can do it by one leveling process .Equipment1. level instrument2. staff3. tripod4. chalk5. tape meterProcedureAt the first time we must find the two points that we want determine the difference height between them , after that we will divide the distance between the points to two or more section , this is because it that we cannot find it by one level process, after that we detect some other place to return to the first point that is to know the ratio of errors that we have made at applying the work.Then we will detect the center of each section to setting up the level instrument at this point, at this time we must apply the midpoint leveling, because it's a best method for leveling at high accuracy. Then we can read the first point (back sight 1) and read the second point (fore sight 1). After that we must change the place of level instrument to second section and setting up the level at the center between (foresight 1 ) which in this step called (back sight 2) and (fore sight 2).The point of (f.s 1)and (b.s 2) is known as turning point .We will complete the other section such as the previous process.At the last to determine the difference elevation between the two main points( ∆H), we must sum the difference elevation of each section ( ∆H= ∆ h1+ ∆ h2 +∆ h3+………+∆ hn), and at last the summation of all (∆H) must be equal to zero, but it is allowable to make errors till (20 mm), but if the total of all errors more than allowable error, the process must be refused.CalculationStation 1Distance between A & B= 22 mPoint A B.S 1=1.403 mPoint B F.S 1=1.361 m∆h1= B.S 1- F.S 1 = 1.403 - 1.361 = 0.042 mStaition 2Distance between B & C= 28 mPoint B B.S 2= 1.678 mPoint C F.S 2= 1.020 m∆h2= B.S 2- F.S 2= 1.678 - 1.020 = 0.658 mStaition 3Distance between C & D =12 mPoint C B.S 3 =1.938 mPoint D F.S 3 =0.785 m∆h3 = B.S 3- F.S 3 = 1.938 - 0.785 = 1.198mStaition 4Distance between D & E =16 mPoint D B.S 4 = 0.557 m elevation= 103.477 mPoint E F.S 4 =1.788 m∆h4 = B.S 4- F.S 4= 0.557 - 1.788 = - 1.231 mStation 5Distance between E & F = 30 mPoint E B.S= 0.310 mPoint F F.S= 1.954 m∆h5= B.S5 - F.S5 = 0.310 - 1.954 = -1.644 mStation 6Distance between F & A =28.9 mPoint F B.S 6= 1.972mPoint A F.S 6= 1.005m∆h6= B.S 6 - F.S 6 = 1.972 - 1.005 = 0.967 mDiscussionAt this test we talked about one of the leveling methods which it is the closed series level circuit.In this test we determined the distance in elevation by closed level circuit, at any leveling process we have made some errors that is caused from the number of station or wrong reading the point by the students, and the weather was not suitable for working because it was cold there was strong wind at that time. At ending the report we knew that that our amount of error was equal to (0.010 m) that it is less than global standard allowable error that is (0.020 m),Sources of errors1. personal error2. instrument error3. natural error.


Can you install travertine over glued down linoleum?

you can but it will break up fast,your better off getting a floor scraper and remove your old flooring.but with doing that you may have to level your floor(lumps left from glue will make an even floor impossible).go to your local hardware store and ask for a self leveling cement premixed ready to go.


How to lay tile over hardwood floor?

You should not tile on top of a hardwood floor. If you do, it will crack as the wood underneath will expand and contract throughout the seasons. Instead you should be installing on top of some sort of concrete floor. You could either add mud/self leveling mix or cement board. You may also want to remove the hardwood first, if you can.

Related Questions

How to level the floor for laminate installation?

To level the floor for laminate installation, you can use self-leveling compound or plywood underlayment. First, clean the floor and remove any debris. Then, follow the manufacturer's instructions for applying the self-leveling compound or installing the plywood underlayment to create a smooth and level surface for the laminate flooring.


How can I level a plywood subfloor in preparation for installing laminate flooring?

To level a plywood subfloor for laminate flooring installation, you can use a self-leveling compound or plywood shims to fill in any gaps or uneven areas. Make sure the subfloor is clean and dry before applying any leveling materials. Follow the manufacturer's instructions for the leveling compound and allow it to dry completely before proceeding with the laminate flooring installation.


How can I ensure proper leveling of the floor for laminate installation?

To ensure proper leveling of the floor for laminate installation, you should first clean and prepare the subfloor. Next, use a leveling compound to fill in any low spots and smooth out any uneven areas. Finally, use a long straight edge or level to check for any remaining dips or bumps before laying down the laminate flooring.


How can I ensure a self-leveling wood subfloor is properly installed in my home renovation project?

To ensure a self-leveling wood subfloor is properly installed in your home renovation project, follow these steps: Prepare the existing subfloor by cleaning and repairing any damage. Apply a primer to the subfloor to promote adhesion. Mix the self-leveling compound according to the manufacturer's instructions. Pour the compound onto the subfloor and spread it evenly with a trowel. Use a leveling tool to ensure the subfloor is flat and even. Allow the compound to dry completely before installing any flooring on top. By following these steps carefully, you can ensure a properly installed self-leveling wood subfloor in your home renovation project.


What are the benefits of using self leveling compound for flooring projects?

Self-leveling compound is beneficial for flooring projects because it creates a smooth and level surface, making it easier to install various types of flooring such as tile, hardwood, or laminate. It also helps to correct uneven or sloping floors, improves the overall appearance of the floor, and can save time and effort during the installation process.


How to use floor leveling compound effectively?

To use floor leveling compound effectively, follow these steps: Prepare the subfloor by cleaning and priming it. Mix the leveling compound according to the manufacturer's instructions. Pour the compound onto the floor and spread it evenly with a trowel. Use a leveling tool to smooth out any bumps or uneven areas. Allow the compound to dry completely before installing flooring on top.


What is the best flooring option for uneven concrete surfaces?

The best flooring option for uneven concrete surfaces is self-leveling concrete or a floating floor system, such as laminate or engineered hardwood. These options can help create a smooth and level surface over the uneven concrete.


What is the recommended method for preparing a wood subfloor for flooring installation, including the use of leveling compound?

The recommended method for preparing a wood subfloor for flooring installation involves cleaning the surface, repairing any damage, and ensuring it is level. If needed, a leveling compound can be applied to create a smooth and even surface for the new flooring to be installed on top of.


What is the best method for leveling a wood subfloor using leveling compound?

The best method for leveling a wood subfloor using leveling compound is to follow the manufacturer's instructions carefully, ensuring the subfloor is clean, dry, and free of debris before applying the compound. Use a straight edge or level to identify low spots and apply the compound evenly to achieve a smooth and level surface.


What is the best floor leveling compound for wood subfloors?

The best floor leveling compound for wood subfloors is a self-leveling compound that is specifically designed for use on wood surfaces. These compounds are easy to apply and provide a smooth and level surface for the installation of new flooring materials.


Can you use leveling compound on an existing tile floor?

No


Can you put carpet over uneven constructed laminate floor in the basement?

No, it will wear unevenly. If the floor is solid (ie not warped floorboards) and the uneven bits slight, you can spread leveling compound (a sort of wet cement slurry) over the uneven floor to obtain a flat surface.