Is it true about the work breakdown structure is a tool that can help identify and assess technical risk?

yes


Because the Work Breakdown Structure (WBS) represents a snapshot in time it is not updated throughout the acquisition process?

true


Who prepares a work breakdown structure?

Usually the Project Manager with the help of his Leads is involved in the creation of the Work Breakdown Structure.


What type of information is not required in a work breakdown structure?

In a work breakdown structure, detailed cost estimates and resource assignments are not required.


What is material consumption?

What is work breakdown structure


Is it true the Systems Engineering V Model is another way to represent the system model or the Work Breakdown Structure for a given program?

yes


What document describes detailed information about each Work Breakdown Structure item?

A WBS (Work breakdown structure) Dictionary.


What is the definition of a work breakdown structure?

A Work Breakdown Structure (WBS) is a diagram of the project deliverables in a tree (hierarchical) format. According to the PMBOK, work not defined in the WBS is outside the scope of the project.


What does W B S mean?

Work Breakdown Structure


What is Cost breakdown Structure?

Cost Breakdown Structure is the breakdown of a project into cost elements. This breakdown is typically in line with the Work Breakdown Structure (WBS); indicating "where" cost are allocated. The breakdown can sometimes be in line with the company's Chart of Accounts, indicating "what" the costs are for. In theory, cost could be in line with "who" is spending the cost, "when" costs are being spent, etc.


What breaks a complex task into series of subtasks?

Work Breakdown Structure


What kind of work Breakdown Structure is prepared and maintained by the Government?

Program