The thickness of concrete that can be poured when drying typically ranges from 4 to 12 inches. Thicker pours may require additional support or reinforcement to prevent cracking.
For optimal results, self-leveling concrete should be poured at a thickness of 1/4 inch to 2 inches. Thicker pours may lead to cracking or uneven drying.
should be at lest 4 inches
7.1
6.67 Cubic Yards
15 cubic yards
15 cubic yards
4.938 cubic yards.
1.78 cu. yds.
one (1) cubic yard of concrete four inches thick will cover 80 sq. feet. 85 yards x 81 = 6885 sq. feet.
Okay first dont go 3 inches thick ... it will crack it's to thin 3.5 " to 4" thick is the min. and it'll take 2.777 yards so you'll have to get 3 yards
how much does it cost to form and pour concrete in Mobile, AL
10.00 dollars per square foot plus permit cost.