The height that is used as the base level from which all other levels are established. Used in construction when when setting out a house. Also called a benchmark.
According to ASME Y14.5, a primary dimensioning datum requires at least 3 points of contact to establish the datum plane. Two points of contact are required for the secondary datum and 1 point of contact is required for the tertiary datum.
To select a suitable datum, consider a stable reference point on the workpiece or surface. Mark the datum clearly and securely. When marking out, ensure all measurements and reference points are taken from this datum to maintain accuracy and consistency. Working from a different datum can lead to incorrect measurements, misalignments, and errors in the final product. It is crucial to avoid this by consistently using the established datum.
1. Question is really vague, it is important to mark out the selected datum, as you just selected that datum? What else are you going to do with It? If you are working from another datum point just ensure that it is a good datum with critical measurements checked otherwise the new datum could throw out al measurements. P.s i wish the selected retards would stop answering with nonsense answers.
1) Track your progress, and 2) establish good job search practices.
To establish the primary datum plane using CMM (Coordinate Measuring Machine) data, a minimum of three measurement points is typically required. These points should be non-collinear and positioned appropriately to define the plane's orientation accurately. By using these points, the CMM can calculate the plane's best-fit surface, ensuring the datum is established correctly for subsequent measurements.
Selecting and establishing a suitable Datum is critical, ensure your datum is at a fixed point. Normally a hole/slot. Holes and slots a normally lasor cut, ensuring they are at an extremely high tolorance already. Then reference the slot or hole to another near by slot or hole. Using these selected points will give you accruate points of measurement/datum.
Datum is not the plural of data. Datum is singular, and its plural form is data.
1. Question is really vague, it is important to mark out the selected datum, as you just selected that datum? What else are you going to do with It? If you are working from another datum point just ensure that it is a good datum with critical measurements checked otherwise the new datum could throw out al measurements. P.s i wish the selected retards would stop answering with nonsense answers.
To select and establish a suitable datum on a metal piece, first identify the critical features that will serve as reference points for measurement and machining. Choose datums based on factors such as functional requirements, stability, and ease of access. Once identified, use precise measuring tools to define the datum's exact location and orientation, ensuring it is clearly marked and consistent throughout the manufacturing process. This establishes a reliable reference for all subsequent operations, enhancing accuracy and repeatability.
Assumed ordnance datum is a reference point used in surveying and engineering to establish a consistent vertical level from which elevations are measured. It serves as a baseline for determining heights, depths, and levels of various geographical features or structures. This datum is particularly useful in areas where a formal or established mean sea level is not available, providing a practical standard for construction and mapping projects.