answersLogoWhite

0

In project management, the quality triangle consists of cost, schedule, and scope. These three elements are interconnected, meaning that changes in one area can impact the others. For example, increasing the scope of a project may lead to higher costs and a longer schedule. Conversely, reducing costs may require cutting back on the scope or extending the schedule. Balancing these factors is crucial for achieving project quality and success.

User Avatar

AnswerBot

4mo ago

What else can I help you with?

Related Questions

What is the relationship between entrepreneurship and management?

relationship between entrepreneur and management


What is the Relationship between project management and other management discipline?

What is the Relationship between project management and other management discipline?


What is the relationship between motivation theory and the practice of management?

Assess The Relationship Between Motivation Theory And The Practice Of Management


What is the relationship between food science catering and hotel management?

Relationship between food science and hotel management


What is the relationship between the area of a triangle and a rectangle?

The relationship between the area of a triangle and a rectangle is a Triangle is base times height divided by 2. Area of a rectangle is length times height.


What is the link between information management and customer relationship management?

Relationship is like boyfriend and girlfriend management and customers are the same


What is the relationship between the slope and the pythagorean theorem?

There is no relationship between slope and the theorem, however the theorem does deal with the relationship between angles and sides of a triangle.


What is the relationship between the angles of a triangle in chord notation?

In a triangle, the sum of the three angles is always 180 degrees. This relationship is known as the angle sum property of a triangle.


What is the relationship between square cube cylinder sphere and triangle?

the relationship between them is that they are use in many ways of living


What is the relationship between the scope, time, and cost in the project management triangle?

In project management, the relationship between scope, time, and cost is often represented by the project management triangle. This triangle illustrates that changes in one aspect (scope, time, or cost) will impact the other two aspects. For example, increasing the scope of a project will likely require more time and money to complete. Similarly, reducing the time allocated for a project may result in increased costs or a reduction in scope. It is important for project managers to carefully balance these three elements to ensure project success.


Who discovered the relationship between the sides of a right triangle?

Pythagorus


What is trade-off triangle?

Trade-off triangle is a relationship between the project variables of resources (people and money), schedule (time), and features (scope). These variables exist in a triangular relationship. After you have established the triangle, any change to one of its sides requires a correction on one or both of the other sides to maintain project balance. This includes, potentially, the same side on which the change first occurred.