answersLogoWhite

0

A cut-back is something that is removed or cancelled in order to save money.

User Avatar

Flavio Mitchell

Lvl 13
2y ago

What else can I help you with?

Continue Learning about Management

What are two major factors affecting cutting speed selection?

Two major factors affecting cutting speed selection are the material properties of the workpiece and the type of cutting tool being used. The hardness, toughness, and thermal properties of the material influence how quickly it can be machined without causing tool wear or damage. Additionally, the tool's material, geometry, and coating can determine its ability to withstand heat and wear, thus impacting the optimal cutting speed for effective machining.


What is the relationship between cost, schedule, and scope in the quality triangle of project management?

In project management, the quality triangle consists of cost, schedule, and scope. These three elements are interconnected, meaning that changes in one area can impact the others. For example, increasing the scope of a project may lead to higher costs and a longer schedule. Conversely, reducing costs may require cutting back on the scope or extending the schedule. Balancing these factors is crucial for achieving project quality and success.


What does continuity of supply mean?

What does continuity mean?


What is stop light strategic model strategic analysis?

You would have everything stop in order to analyze it. You could do this by cutting off at a certain date and evaluating based off the time period before that.


What is the relationship between project scope, time, and cost in the quality triangle?

In the quality triangle, project scope, time, and cost are interconnected. Changes in one aspect can impact the other two. For example, increasing the project scope may require more time and resources, which can lead to higher costs. Similarly, reducing the project timeline may require cutting back on scope or increasing costs to meet deadlines. Balancing these three factors is crucial for achieving project quality and success.