answersLogoWhite

0

Go to this website and they have a concrete calculator for just such a thing.

http://www.sonotube.com/tools/concrete_calculator.html

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

What is the minimum and maximum allowable percentage of reinforcement steel in concrete?

The amount of steel required in concrete as reinforcement is measured using a formula that calculates the amount of pressure that will be put on the concrete. There are different formulas to identify the minimum and the maximum amount of needed steel, depending on if you are making a beam, slab, or column.


What is the equation to figure out how much concrete is needed?

its about 12x5x67 respectively


How to calculate how much concrete is needed for a project?

To calculate the amount of concrete needed for a project, you need to determine the volume of the area to be filled with concrete. This can be done by multiplying the length, width, and height of the area. Once you have the volume, you can then calculate the amount of concrete needed by dividing the volume by the coverage area of one cubic yard of concrete. This will give you the total number of cubic yards of concrete needed for the project.


Figureing quanity of concreet?

To figure out the quantity of concrete, you will need to calculate the total length, width and depth in inches. There are online calculators available which can easily compute the total amount needed.


How much concrete is needed for a fence post?

The amount of concrete needed for a fence post depends on the size and depth of the hole. Typically, a 50 lb bag of concrete mix is enough for one standard fence post.


Amount of concrete needed for area 1.75m x1.2m x0.6m?

1.26 m^3


How many pounds of concrete are needed per fence post?

The amount of concrete needed per fence post typically ranges from 50 to 80 pounds, depending on the size and depth of the hole.


How much concrete is needed per fence post?

The amount of concrete needed per fence post depends on the size and depth of the hole, but typically around 1/2 to 1 cubic foot of concrete is used per post.


How much concrete is needed to effectively stop radiation?

Concrete is a common material used to shield against radiation. The amount of concrete needed to effectively stop radiation depends on the type and intensity of the radiation. Thicker layers of concrete provide better protection against radiation. Generally, a thickness of at least several feet of concrete is needed to effectively stop most types of radiation.


How is concrete measure in units?

In the United States, if you are buying concrete mixed up and ready to pour, it is typically sold by the cubic yard (3ft x 3ft x 3ft) volume. But they usually call this just a 'yard' of concrete, knowing that it is a cubic yard.


How do you calculate concrete needed?

length*breadth*depth of the structure=...........m3 of concrete is needed. .


Do they have lime in concrete?

Yes, lime is one of the ingredients in concrete mixes. It is used to improve workability and reduce the amount of water needed in the mix, which ultimately helps increase the strength and durability of the concrete.