To determine how many 500x400 mm pavers fit into 10 square meters, first convert the dimensions of the paver to meters: 500 mm = 0.5 m and 400 mm = 0.4 m. The area of one paver is 0.5 m * 0.4 m = 0.2 square meters. Therefore, in 10 square meters, you can fit 10 / 0.2 = 50 pavers.
You would need 320 pavers to cover 160 square feet with 6x9 pavers, assuming each paver covers 0.5 square feet.
It will take four pavers to cover one square foot. You will need 720 pavers.
You would need approximately 104 pavers to cover 250 square feet with 16 x 16 pavers, assuming no cuts or wastage. This calculation accounts for the fact that each paver covers 1.78 square feet (16 x 16 = 256 square inches, which is equivalent to 1.78 square feet).
To determine how many 6x9 pavers are needed to cover 400 square feet, first calculate the area of one paver. A 6x9 paver measures 54 square inches (6 inches x 9 inches). There are 144 square inches in a square foot, so one paver covers 54/144 = 0.375 square feet. To cover 400 square feet, you would need 400 / 0.375 ≈ 1067 pavers.
To determine how many 12-inch by 12-inch pavers are needed for a walkway area of 30 square feet, first convert the dimensions of the paver to square feet. Each paver is 1 square foot (12 inches x 12 inches = 144 square inches, which equals 1 square foot). Therefore, to cover 30 square feet, you would need 30 pavers, since each paver covers 1 square foot.
0 just kidding haha
How many brick pavers in a square foot
6x3 would require 2 pavers by 4 pavers to make a square foot which is 8 pavers per square foot. 240 pavers. That's only a 5 foot by 6 foot square.
112.5 without any waste.
31 Get 35 for breakage.
You would need 320 pavers to cover 160 square feet with 6x9 pavers, assuming each paver covers 0.5 square feet.
It will take four pavers to cover one square foot. You will need 720 pavers.
One!
how many 12 in by 12 in pavers is required for30 square feet
That will depend on the size of your pavers. You have 22,932 square inches to cover.
1125
You will need 9.6 pavers, so you should probably get 10. It will depend if the pavers are inches feet cm's or metres.