"Load Factor" is an indicator of how steady an electrical load is over time.

If your electric billing rate includes both an Energy (kWh) and Demand (kW) charge, your load factor can be calculated by the following formula:

L.F. (percent) = [(Total kWh)/(# Days in Bill Cycle x 24 hrs/day)]/[Peak kW Demand]

If your load factor is low, you should look for ways to even out your electrical usage (i.e., shift energy intensive processes to periods of otherwise low usage).

By increasing load factor, you will reduce the impact of monthly demand (kW) charges on your bill.

Another way of looking at load factor is:

LF = average demand / peak demand

for a given period of time.

Load factor is the total energy consumed in a period (kWh) over maximum power that can be delivered(kW) in to no of hours (h) in that period.

Load factor = Energy consumed (kWh)/ max power (kW) x No. of hours (h)

User Avatar

Wiki User

8y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

9y ago

Plant Load Factor is the ratio of the actual output of a power plant over a period of time and its output if it had operated a full capacity of that time period.

Plant Load Factor = Gross Generation / (Installed Capacity * Number of Hours)

This answer is:
User Avatar

User Avatar

Wiki User

16y ago

Answering "What is the meaning of 'plant load factor'

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is the meaning of 'plant load factor'?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the other name of plant factor in load forecasting?

Load Factor


What power plant has high load factor?

Diesel Engine has high load factor


What is the importance of load factor in power system planning?

load factor is the ratio of average load to max demand for a given period.High load factor meansless cost per KWHmore efficient use of power plant


How is plant load factor in solar power plants?

Plant load is a factor in every energy plant. In the case of solar power plants, the plant load factor is at an average of 75%. This means 25% of the time, optimum operation is not utilized. This number has to be compared with start up costs, operating costs and income generated to determine the feasibility of conversion to solar energy.


How do you calculate the plant load factor of hydro electric power plant?

PLF of Hydal Plant - 100% or 101%


How improve load factor?

Ratio of Average load to Maximum demand for a given period (for a day, month or year) is termed as Load factor or Plant Load Factor (PLF). Load Factor = Avg. Load*24/Max Demand*24 ......... For a Day. This Load factor is very important in the sense of calculating the overall generation cost. It is always less than 1. Higher the LOAD FACTOR of a power station,lesser the overall per unit generation cost of the power station.


Plf related to solar?

Yes, Plant Load Factor (PLF) is related to solar.


What is the meaning of a biotic factor?

A biotic factor is any living organism, such as a plant or an animal, that lives in a biome.


What is the maximum plant load factor a gas turbine gives when operating in open cycle?

Depends on what type of gas, plant size and cycle and carriage.


How do you calculate load factor when plant machinery is connected with two supply source ie one is from govt. electricity board supply and another is from diesel generator set supply?

LOAD FACTOR = AVERAGE LOAD ÷ PEAK LOAD AVERAGE LOAD = KW-HRS (ENERGY) ÷ NO. OF OPERATING HOURS IF THE LOCAL PUBLIC ELECTRIC COMPANY CANNOT SUPPLY A CERTAIN PLANT DURING PEAK HOURS -- THE SOLUTION IS TO USE A SECONDARY PRIME POWER FROM THE ENDUSER TO MEET DEMAND LOAD. IF THE ARRANGEMENT IS 12 HRS. FOR NORMAL POWER AND 12 HRS. FOR GENSET -- THE LOAD FACTOR IS THE SAME IF THE AVERAGE LOAD IS CLEARLY DEFINED.


What does a negative value for a reactive power means?

Meaning it's a capacitive load. Leading power factor


Why the power factor improves with the load?

Power factor doesn't necessarily 'improve with the load', but it is determined by the load.