answersLogoWhite

0


Best Answer

On a typical boundary survey the instrument is sighted on a point from which angles will be measured, the backsight, and the next survey point where the instrument will be set up to continue the survey around the property, the foresight.

Intermediate foresights, often "called sideshots," are points to which measurements are made other than the foresight or backsight.

For example, a survey instrument is set up over a point. The horizontal angle on the instrument is set on 0 while sighting on a backsight point that may be a couple hundred feet away. A measurement will be taken to the foresight point which may also be a couple hundred feet away.

There may be a survey marker near the point where the instrument is set up to which a measurement needs to be made. This measurement is called an intermediate foresight or a sideshot.

User Avatar

Wiki User

13y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is an intermediate sight in surveying?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is an sight in surveying?

a negative sight is infect a sight which is negative


What is an negative sight in surveying?

A negative sight in surveying occurs when the vertical line of sight from the instrument to the target is below the instrument's horizontal axis. This can result in incorrect measurements and lead to inaccuracies in the survey data. Negative sights should be avoided by ensuring that the instrument is properly leveled before taking measurements.


How do you use a surveyors compass?

A surveyor's compass, or a circumferentor is a device used in surveying to measure horizontal angles. It is used by directing the line of sight.


Types of surveying in civil engineering?

Plain Surveying Geodetical Surveying


What is the obstacle of chain surveying?

One obstacle in chain surveying is the need for a clear line of sight between survey points, which can be challenging in areas with dense vegetation, buildings, or rough terrain. Additionally, inaccuracies can arise from errors in measurement and recording when using the chain and ranging rods.


Different types of compass in the field of surveying?

prismatic surveying and surveying compass.


What are general classifications of surveying?

General classifications of surveying include geodetic surveying, plane surveying, topographic surveying, cadastral surveying, construction surveying, and hydrographic surveying. Geodetic surveying deals with large-scale measurements of the earth's surface, while plane surveying focuses on small-scale measurements on a flat surface. Topographic surveying involves mapping of the land's natural features, cadastral surveying deals with land parcel boundaries, construction surveying is used for building projects, and hydrographic surveying is for mapping bodies of water and their features.


What has the author Philip Kissam written?

Philip Kissam has written: 'Surveying for civil engineers' -- subject(s): Surveying 'Surveying practice' -- subject(s): Surveying


What is the difference between land surveying and geomatics?

geomatics differ with surveying in that it encompasses a broad range of disciplines than surveying,let alone surveying is a discipline under geomatics


Explain types of surveying?

Land surveying is mapping out land for land development. Hydrographic surveying is mapping bodies of water. Engineering is a type of surveying that has to do with buildings roads and other man made things.


What is foresight in surveying?

Foresight in surveying refers to the sighting of a target or point that is ahead of the surveyor's current position. It helps determine the direction of the survey line and aids in maintaining alignment and accuracy during measurements. By focusing on foresights, surveyors ensure precise and reliable data collection for mapping and construction projects.


What is fly levelling?

Fly leveling is a leveling that is done to connect benchmark to the starting point of the survey line. In this leveling only back sight and fore sight readings are taken and auto level is moved strictly on the line joining benchmark and starting point of survey line.