answersLogoWhite

0


Best Answer

because the author saw and studied the area both before and after the dam was built.

User Avatar

Wiki User

6y ago
This answer is:
User Avatar
User Avatar

Anviously

Lvl 1
2y ago
Thanks :)

Add your answer:

Earn +20 pts
Q: Why does author edward abbey feel that he is qualified to evaluate how the land has changed after the building of the Glen Canyon Dam?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Why does author Edward Abbey feel that he is qualified to evaluate how the land had changed after the building of the Glen canyon dam?

Edward Abbey believes he is qualified to evaluate the changes in the land after the building of Glen Canyon Dam because he spent a significant amount of time in the area before the dam was constructed, allowing him to have firsthand experience and intimate knowledge of the land. Additionally, Abbey worked as a park ranger in the region and developed a deep connection to the landscape, giving him a unique perspective on the environmental impact of the dam.


What does Edward Abbey say that visiting the Glen Canyon area both before and after the construction of the dam makes him qualified to do?

The answer is C. Evaluate the changes in the land


When was Grand Canyon Park Operations Building created?

Grand Canyon Park Operations Building was created in 1929.


When was Old Administration Building - Bryce Canyon National Park - created?

Old Administration Building - Bryce Canyon National Park - was created in 1933.


What is the most famous building in America?

The Grand Canyon


How the grand canyon changed?

water went in it and made it under sea level


What effect did the Glen Canyon Dam have on Grand Canyon?

It made a big sound. It did not make a big sound the Glen Canyon Dam changed the ecosystem of the Grand Canyon. I had the same question for an assignment that I had for school. I found the answer in a book that I had. Hope it helped!


Which example shows how earth's surface has been changed by fast moving water?

the answer is a canyon


The Boulder Canyon Project helped to control floods of the with the building of the Hoover Dam.?

Colorado River


The Boulder Canyon Project helped to control floods of the with the building of the Hoover Dam?

colorado river


The Boulder Canyon Project helped to control floods of the what with the building of the Hoover Dam?

The Colorado River.


How does the author use ethos in The damnation of canyon?

apex: Having thus seen glen canyon both before and after…its damnation, I feel that I am in a position to evaluate the transformation of the region caused by construction of the dam.