answersLogoWhite

0

The rotations in the Gulf of Mexico, are generally 2 weeks on/ 2 weeks off. It might actually be 15 days on, 13 days off, given the overlap necessary. Overseas, a 28/28 day rotation is common. People may return to their home country on their time off, paid for by the contractor.

User Avatar

Wiki User

15y ago

What else can I help you with?

Related Questions

What is the longest time you can stay on an oil rig?

please tell me how long you stay on a offshore oil rig


How long do you have to stay on an oil rig if I am just an employee?

Six months.


How long does it take to build an oil rig?

It takes 20000 day to build an oil rig.


What is the drilling platform in the sea that is two words?

Oil rig oil Derick


Are you more likely to see an oil rig on boat or on a truck?

on a oil rig boat


What is the difference between and oil rig and an oil platform?

An oil rig is an oil platform or oil production platform. A drilling is different though.


How do you build a oil rig on oil tycoon 2?

St. Petersburg has an offshore field to build the oil rig.


Is an oil rig known as a Christmas tree?

No a christmas tree is only part of an oil rig.


Where is Exxon Oil Rig on Long Beach?

The Exxon Oil Rig, also known as the Elly platform, is located off the coast of Long Beach, California, in the Santa Barbara Channel. It is situated approximately 14 miles offshore, near the city of Long Beach. The platform is part of a network of oil rigs in the area, contributing to offshore oil production.


Was there another oil spill in the Gulf?

A oil rig exploded on April 20, 2010 and oil gushed out for months before the hole was plugged. There was another oil rig explosion in the Gulf on September 2, 2010 when an oil rig exploded.


What is derrick?

oil rig.


Are oil rigs and oil platforms the same thing?

Yes. An oil rig and an oil production platform are the same thing.A drilling rig is different though.