The pipe usually goes under the slab.
That all depends on how long said 3" pipe is?
Same as an 3" - 8 " pipe
$8,300
No, actually the volcanic pipe is horizontal.
A concrete mixture of sand, cement, and small gravel is used to make the concrete from which the tubular concrete pipe is made. The pipe is made of concrete.
I would need to know how the pipe you want to use is set. I will guess that it might be horizontal? There is a saddle clamp available that could possible be used. A section of pipe could be cut out and an inlet added. Rubber couplers would be used to connect the two. You also have to consider how and where a toilet would be vented. Is there a vent behind where you are planing to install the toilet and if not can one be added?
By strict calculations OR install the pipe longer then needed and after the finish work cut the pipe to the required height and install the flange
To install a toilet flange on concrete, you will need to first mark the location for the flange, then drill holes into the concrete using a masonry bit. Next, insert concrete anchors into the holes and secure the flange to the concrete using screws. Finally, connect the flange to the waste pipe and ensure it is level before installing the toilet.
No, actually the volcanic pipe is horizontal.
To effectively install a concrete slab drain in your outdoor patio, follow these steps: Plan the location and size of the drain to ensure proper water drainage. Dig a trench for the drain, making sure it slopes away from the patio. Install a gravel base and a PVC drain pipe in the trench. Pour concrete around the drain pipe, making sure it is level with the patio surface. Allow the concrete to cure before testing the drain with water to ensure proper drainage.
The pipe must be fixed (not rolled) in the horizontal position. With the pipe horizontal, the weld is vertical. The pipe being fixed requires the welder to weld flat (top), vertical (sides), and overhead (bottom). The pipe must be fixed (not rolled) in the horizontal position. With the pipe horizontal, the weld is vertical. The pipe being fixed requires the welder to weld flat (top), vertical (sides), and overhead (bottom).
Check out: www.innovativepipeliners.com. They install a pipe lining kit that lines the entire length of pipe without excavation!