Vents are run through the roof, shower and tub drains are installed, sink drains are stubbed out of walls and/or floors, washing machine box is installed, cold and hot water lines are stubbed out of walls and/or floors, sill-cocks are installed on exterior of house, and nail plates are placed over pipes going through studs so they will not be penetrated by nails or screws. Basically anything pertaining to Plumbing that is inside a wall or cannot be done after drywall, tile, or flooring is installed.

User Avatar

Wiki User

16y ago

What else can I help you with?

Related Questions

What is a project phase?

A Project Phase is a timeline in the Project lifecycle where a related set of activites are performed. Once those activites are completed, work begins in the next phase. For ex: After the Project Initiation Phase is completed, work begins in the Project Planning phase. Once Planning phase is complete, work begins in the Project Execution phase and so on...


Using ccor work on contaminated material when must you work in mopp 4?

during the initial phase


What is sanitary and plumbing permit?

A sanitary and plumbing permit is a legal authorization required for the installation, alteration, or repair of plumbing systems and sanitary facilities in buildings. This permit ensures that the work complies with local building codes and health regulations, promoting public safety and environmental protection. Obtaining the permit typically involves submitting plans for review and may require inspections during and after the work is completed. Failure to obtain the necessary permit can result in fines and the need to undo unpermitted work.


When using the chemical contaminated object rule to work with or near contaminated materials during the initial phase of the chemical contaminated object rule?

during the initial phase


When the phase begins most BEAR asset support work has been completed and the engineers focus shifts to operations maintenance and upgrade activities?

Sustainment


When the what phase begins most BEAR asset support work has been completed and the engineers focus shifts to operations maintenance and upgrade activities?

sustainment


Detailed design work on a product would typically begin after the?

conceptual design phase is completed. During the conceptual design phase, high-level ideas and requirements are established, while the detailed design phase involves creating specific drawings, plans, and specifications for the product. This phase focuses on the technical aspects of the product, such as dimensions, materials, and manufacturing processes, to ensure that the product can be accurately produced according to the initial concept.


When using the Chemical Contaminted Object Rule CCOR to work with or near contamintated materials when can you use only protective gloves?

during the initial phase


When using the CCOR to work with or near contatminated materials when must you work in MOPP 4?

During the initial phase.


In dividing cells most of the cells work occurs during what phase of mitosis?

Not sure


When using the chemical contaminated object rule to work with or near?

during the initial phase


How does home plumbing work?

Same as all other plumbing in civilized countries