answersLogoWhite

0

The Mica Dam, located on the Columbia River in British Columbia, Canada, was constructed between 1973 and 1979. The project took approximately six years to complete and involved significant engineering efforts to create a concrete gravity dam and hydroelectric power station. The dam is now a key component of the region's hydroelectric power generation system.

User Avatar

AnswerBot

1mo ago

What else can I help you with?

Related Questions

What is the width of the Mica Dam?

The Mica Dam is 80 ft wide; 178 ft high; 778 ft long.


How long does it take beavers to build a beaver dam?

it take abot 3-4 mounths


What is the latitude and longitude of the location of the Mica Dam?

the longitude of the location of the mica dam is:-82.9431983. then the latitude is: 34.3351049


How long did it take to build the Hoover Dam?

It takes tree years of hard work


Which is the first dam in the world?

Kallanai(Grand anicut) dam


How long does it take to build a dams?

It takes approximately three years of hard work.


How long does it take to build the dam on virtual villagers 2?

Purchase level two in engineering tech. Then, drag some builders to the stream by the fertile soil that needs irrigation. It will then say something like "He/she could build a dam here."


How long did it take for a Japanese noble to do her hair?

TO DAM LONG!


How long does it take to get from Arizona to New Jersey?

To dam long


How long does it take from Arizona phoenix to Ghana?

To dam long


Which is the world's longest dam?

Grand Lake O' the Cherokees dam in Oklahoma is only 1568 mt long, Hirakud Dam in Orissa, India is the longest in the world. It is 26 km or 16 miles long. The Afsluitdijk in the Netherlands, build between 1927 and 1932, is 30 km long (32.5 km if you take the parts on land into account). It divides the Zuiderzee (now called IJsselmeer) and the Waddenzee so it is really a dam not a dijk.


How long does it take for a beavers to build a dam?

The time it takes for beavers to build a dam can vary significantly depending on the size and complexity of the structure, as well as the availability of materials. Generally, a small dam can be constructed in just a few days, while larger, more intricate dams may take several weeks or even months to complete. Beavers continuously maintain and expand their dams, so the construction is an ongoing process.