yes
1931 construction began 1935 it was finished
Lake Mead is formed by the dam; until the dam was finished, there was no Lake Mead to hold back. The river was diverted during the construction.
Some of the innovations that made the construction of the Hoover Dam possible is.....................................................................................................................................................................................................................................................................................................................................................................................................................GO AND DO YOUR MOM!
Construction of a major dam on the Colorado River.
After Hoover Dam's construction was completed in 1936.
Construction of Hoover Dam began on April 20, 1931, the dam was completed on March 1, 1936.
Hoover Dam was finished in 1935.~Calli
2004
all styles ;)
1943
Herbert Hoover - Boulder Dam in the Black Canyon on the Colorado River was renamed to Hoover Dam in his honor.
Is there a picture of a man falling off Hoover Dam during construction and he is waving?