This is the additional length of steel of one structure required to be inserted in other at the junction. For example, main bars of beam in column at beam column junction, column bars in footing etc. The length requirement is similar to the lap length mentioned in previous question or as per the design instructions.
Anchorage length is the required distance to transfer a load and is dependent on the materials used. Development length is the length of the reinforcement bar or rod required to transfer the load safely to another bar.
formula of steel weight per sqm
you can generally use 180 degree hooks, to provide enough anchorage in slabs with no edge beams. use the Ldh formula (12.5.2) of ACI 318-11
It is the length of the main bar provided at the column beam junction or column footing junction to allow for the development of stresses to its design strength.
lap length in tension including anchorage value of hooks in flexural tension shall be greater of development length or 30 times dia of bar. In compression, its equal to development length. In general, 50 times dia is provided.
Current maps on the Iditarod's official website claim 1112 miles, but that includes the cerimonial start in Anchorage that is not timed.
The Biome of Anchorage Alaska is Tundra.
The address of the Anchorage Museum is: 121 West Seventh Avenue, Anchorage, AK 99501-3611
Anchorage is a city in Alaska.
There are no glaciers in Anchorage.
Alaska's most populated city is anchorage.
The web address of the Anchorage Museum is: www.anchoragemuseum.org