because he wanted to finish want his father built before he died
Joseph B. Strauss built the bridge to finish what his father started. His father built the bridge so he could show that he was a bright man, and for the challenge. This is not an accurate answer. See discussion for more information.
Joseph Strauss was 63 when he was born?
Joseph B. Strauss. Click on the link below for more information.
It is designed by Engineer Joseph B. Strauss and build in Wednesday April9,2003
it is Jose Baerman Straussph who made the golden gate bridge.=)
The Golden Gate bridge was built by Cheif Engineer Joseph Baermann Strauss from a artistic family mum being a artist and dad being a artist and writer he always wanted to be a artist but ended up being one of the most famous engineer and bridge builder in the world for building the London bridge.
Charles Alton Ellis was the man who designed it, and Joseph P. Strauss was the Chief Engineer, but the actual workers names are probably lost to history.
Joseph B Straus and completed in 1937.
It was designed by an independent architect named Joseph Strauss, with help from Irving Morrow.
because the bridge, which was designed by engineer Joseph Strauss was built to connect San Francisco with Marin County across the 1600 meter wide strait known as the Golden Gate which connects the San Francisco Bay with the Pacific Ocean
The Golden Gate Bridge started construction in 1933 by Joseph B. Strauss and his helpers the other people that built it was a huge family, the Busenlehner's that came all the way from straubling Germany. MY family is actually the ones who helpt built it we are a noble family in germany but now i live in the usa... in Alabama haha but were still a pretty big deal in Germany. It was finished in 1937.
Many wanted to build the bridge. The proposal finally took place in 1916 in the San Fransisco Bulletin by former engineering student James Wilkins. They estimated the cost of the bridge for about 100 million super super impractical for the time. The asked bridge engineers the question on if it could be done for less. Joseph Strauss answered it and was very ambitious having built 300-400 bridges already. He said he could do a draw bridge there for 17 million. Strauss was chief engineer in charge of overall design and construction of the bridge project. However, because he had little understanding or experience with cable-suspension designs,responsibility for much of the engineering and architecture fell on other expert..