A Level 2 estimate is a type of cost estimate used in project management and construction that provides a more detailed projection than a Level 1 estimate, which is typically based on rough order-of-magnitude figures. Level 2 estimates incorporate additional details such as project specifications, preliminary designs, and a breakdown of costs into categories like labor, materials, and overhead. This level of estimate is often used during the planning phase to aid in budget development and decision-making. It is generally more accurate but still subject to change as project details are refined.
Estimate where actual budgetary outlay could be + or - 75%
+ or - 75%
Cost risk analysis/assessment provides a program level cost estimate.
To the nearest integer, 2
For multiplication or division, the only reasonable estimate is -2.
confidence level
160 by estimate
level 2 totally
Level 2
Just do what u did 2 get 2 level 2.
The element with 2 electrons in the 1s sub-level, 2 electrons in the 2s sub-level, and 2 electrons in the 2p sub-level is carbon (Atomic number: 6).
Well if you want to go to level 2 then you must do level 1