moderate
False
1200 - 1500 according to your needs or activity level of that day
penis
it differs according to a persons age,sex, and activity level
it differs according to a persons age,sex, and activity level
you will get tired if you are rinning around for a long period of time before you do any sport
True.
a budget which is prepared for one level of activity is:
Over or Under AbsorptionNote that as long as planned level of activity and the actual level of activity is not the same there is always an Over or Under Absorption situationThis is because overhead absorption rate is set at the start of the period based upon an expected level of production and that during the period, the level of output and or overheads will be different from the planned overheads and or output.OVER-absorption occurs when the total overhead recovered or absorbed is GREATER than the actual level of overheads for the period.UNDER-absorption occurs when the total overheads recovered or absorbed is LESS than the actual overheads incurred in the period.
TRUE
fixed budget is prepared at the start of the period and flexible budget is prepared at the end of period it is adjusted from current activity level of company...
Over or Under AbsorptionNote that as long as planned level of activity and the actual level of activity is not the same there is always an Over or Under Absorption situationThis is because overhead absorption rate is set at the start of the period based upon an expected level of production and that during the period, the level of output and or overheads will be different from the planned overheads and or output.OVER-absorption occurs when the total overhead recovered or absorbed is GREATER than the actual level of overheads for the period.UNDER-absorption occurs when the total overheads recovered or absorbed is LESS than the actual overheads incurred in the period.