4 bags
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
25
To find out how many 94-pound bags of Portland cement are needed for a yard of sand, you typically use a 1:2:3 mix ratio (cement, sand, gravel) for concrete. Since a yard of sand weighs about 1,600 pounds, you'll need approximately 533 pounds of cement for that mix. Given that each bag of Portland cement weighs 94 pounds, you would need about 6 bags (533 ÷ 94 ≈ 5.67). Therefore, you would need 6 bags of Portland cement for a yard of sand.
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
4 bags of 50 kg each= 200 kg of cement.
7 cement bags per 1 cubic meter of concrete......
11 bags
7 bags cement
A 15' x 20' x 4" slab needs at least 3.7 cubic yards.
typically one pallet, i believe theres 42 80lb bags on a pallet.
The answer will depend on the size of the cement bags! The answer will depend on the size of the cement bags! The answer will depend on the size of the cement bags! The answer will depend on the size of the cement bags!
There are 27 cubic feet in a cubic yard, and a 60-pound bag of cement typically yields about 0.45 cubic feet when mixed. To fill one cubic yard, you would need approximately 60 bags of 60-pound cement.