basically yh fam, mans got this question aswell, so good try! call me sometime! villa 4 champions league!
In Blanket Overhead Absorption Rate applied is the same however it may differ if a company follow Departmental method Or frther break - up method
If the cost can be tracked towards a cost object, then it is called overhead absorption. If the cost can not be tracked with respect to a specific cost center or cost object, then the entire cost is distributed to all the cost centers, based on the usage ratio. This is called Overhead apportionment. UdhayAnand AVB
The advantage of using blanket overhead absorption rate is that budgeting and costing become simpler. One disadvantage however is that it is harder to know which of the costs centers is consuming most of the money allocated.
The difference between fixed overhead and variable overhead is that fixed overheads are the ones that do not change regardless and variable overheads are the ones that vary depending on the number of units that it produces. An example of fixed overhead is a managers salary.
Boxgirder bridge
Mainly, the difference is that in an overhead cam engine, the camshaft is mounted on the head of the engine, and the valves are still overhead, in an overhead valve engine (sometimes called a "pushrod motor"), the camshaft is in the crankcase.
Interdepartmental communication is the process through which various departments send and receive messages between themselves.Intradepartmental Communication is a process through which the messages send and receive within the department.
Difference between actual overhead and applied overhead is as follows: Difference = 33451 - 32000 = 1450 Difference of variance will be charged to income statement.
Fixed overhead budgeted variance is the difference between estimated budgeted cost and actual fixed overhead cost of production.
What is the difference in gross square meters and square meters
Kohls is a departmental store in United States of America and Coles is a super market in Australia.
Under absorption costing overheads are allocated to production based on predetermined overhead rates like machine hours, or direct labor hours etc while in direct costing overheads are allocated based on activity performed and relationship with production units.