Weaver Company's predetermined overhead rate is $18.00 per direct labor-hour and its direct labor wage rate is $12.00 per hour.

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How do you calculate total manufacturing cost?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How do you calculate total manufacturing costs at the end of the period if beginning goods in process is 5000 ending goods in process is 15000 and cost of goods manufactured is 170000?

Total Manufacturing Cost = Cost of good manufactured + Closing Balance - Opening Total Manufacturing Cost = 170000 + 15000 - 5000 Total Manufacturing Cost = 180000


How do you calculate units?

Cost of case divided by number of units. For example you bought a dozen eggs for $ 24.. what is the unit price per egg? $24 / 12 = $2 per egg. or say you are calculating the cost of manufacturing 1 unit.. given: the cost of manufacturing 2000 units of product ABC is as follow, find unit price? Total material cost $ 5000 Total labour cost $ 4000 Other expenses $ 1000 ---------- total cost of manufacturing $ 10000 solution: Total Cost/ no. of unit manufactured 10000/2000 = $5 per unit


How can you calculate variable manufacturing cost per unit?

Total Variable costs divided by the cost of units


Formula for Total operating income?

how to calculate total operating income in Manufacturing Sector


How do you calculate unit price?

Cost of case divided by number of units. For example you bought a dozen eggs for $ 24.. what is the unit price per egg? $24 / 12 = $2 per egg. or say you are calculating the cost of manufacturing 1 unit.. given: the cost of manufacturing 2000 units of product ABC is as follow, find unit price? Total material cost $ 5000 Total labour cost $ 4000 Other expenses $ 1000 ---------- total cost of manufacturing $ 10000 solution: Total Cost/ no. of unit manufactured 10000/2000 = $5 per unit


How do you calculate Total Cost without Total variable cost?

To calculate the Total Cost without Total variable cost, one should estimate for the variables or substitute for the variables with a variable such as X or Y and then solve for the approximate total cost.


Does prime cost plus conversion cost equal the cost of manufacturing?

Total Manufacturing Cost = Direct Material + Direct Labor + Factory Overheads Prime Cost = Direct material + Direct Labor Conversion Cost = Direct Labor + Factory Overhead So yes prime cost and conversion cost is equal to total manufacturing cost


Abel companys manufacturing overhead is 20 percent of its total conversion costs If direct labor is 38000 and if direct material are 47000 the manufacturing overhead is?

Manufacturing Overheads = 20% of Conversion CostTotal Conversion Cost = ?Total Conversion Cost = Direct Labor + Manufacturing Overheads100% = 80% + 20%Total Conversion Cost = direct labor * 100/80Direct labor = 38000Total Conversion Cost = 38000 * 100/80Total Conversion Cost = 47500Manufacturing Cost = Total Conversion Cost - Direct LaborManufacturing Cost = 47500 - 38000Manufactruring Cost = 9500


How do you calculate total cost of job?

i


How do you figure average manufacturing cost per unit?

total cost / number of units


How calculate total period cost?

A total period cost is anything that is not prepaid. To calculate period cost, just include anything that is charged in the period incurred.


How do you calculate variable cost?

Variable cost = Total Cost/ fixed cost