answersLogoWhite

0


Best Answer

40 feet, NO LESS then $7,100 plus applicable taxes, considering the line is outside and should be MILL wrapped or protected by 15# felt with coal tar enamel and be tested 50% greater then the actual working pressure and with related filing and inspections

User Avatar

Wiki User

15y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: How much should a plumber charge to put in a gas line to an outdoor fire pit 40 ft away from the gas meter?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What are the release dates for Ed the Plumber - 2004 Abatement Meter?

Ed the Plumber - 2004 Abatement Meter was released on: USA: 8 September 2007


What size gas meter do you need on your house if I am installing a tankless hot water heater?

Standard meter will suffice, need to know pressure from meter to house. Size pipe appropriately for gas pressure coming into house X distance to water heater. Gas company or plumber should be able to help with this calculation.


Who holds the mens 3200 meter outdoor world record?

Daniel Koman.


Can you replace your own electric meter?

Not unless you are a licensed and certified plumber and have the authority to possess and install your own regulating device.


What should a full charge read on a battery for a BMW?

With engine not running it should read 12.6 volts if it is fully charged. You will need a digital volt meter to check it.


How much is the 200 meter dash?

That would depend on how much they charge per meter and whether they charge you for the full amount of for just as far as you manage to run.


In athletics what is the shortest running distance?

In indoor track and field, there is 50 meter dash, however, in outdoor track and field, 100 meter dash is the shortest.


Does increasing gas meter size override need to increase pipe size?

No. Meters are set for different outgoing pressures. Higher pressure coming out meter allows for smaller piping to be used. A gas pressure regulator will be needed at each appliance to reduce gas pressure to required gas pressure for appliance. Gas company should be able to take care of meter. Gas company or plumber should know how to size piping.


If you charge four 50v capacitors in parallel then remove the 50v battery and hook it up to a volt meter will the meter say 50v or 200v?

If you charge four 50v capacitors in parallel then remove the 50v battery and hook them up to a volt meter the meter will indicate 50v.


How do you measure the level of charge in a battery?

you put a volt meter on it


Use volt meter to check 12 volt battery charge level?

With your volt meter, touch the positive battery with the red wire and black to ground (neg, ) on the battery. With the engine off you should have a reading of anywhere from 12.2 to 12.6 volts. That is good. With the engine running at high rev's you should have a reading of any where from 14 to 14.5. When you charge the battery with a 2 amp charger it will take several days and the charge level will go up to 14.5 or so volts.


Where do you start for a 400 meter race?

You normally start a 400m race (outdoor track) at the same place as 800, 1600 and possibly 300; which isn't a common event in outdoor track and field anyway