Amps rating is miss-match & due to loose contact over heat OR mechanism it self failed.
In three phase part load unbalance in each phase.
maybe there is gonna be three nights with four days like they will sleep at three nights and when is four days they wont sleep the four days
three weeks and four days. :)
Four weeks, three days.
no they don't.
Fourteen Thousand Three Hundred Eighty Four Days Later was created in 1996.
No. Seven days is about the minimum.
Electrical range is usually 220V and requires at least a 40A breaker. In a three wire configuration, the white power carries 110V, the black wire carries 220V and the green wire is the ground. A four wire configuration has an additional wire that is neutral.
They are babies for three days, sometimes four.
I have never seen a four pole circuit breaker. Breakers are single, two and three pole. Single pole for 120 volts, two pole for 240 volts and three pole for three phase loads. In North America all neutrals are SN (solid neutrals) and are not switched. In certain applications using a three phase Y-connected load, where complete isolation of the load from the supply is required, the neutral line connects to one pole of a 4 pole circuit breaker.
Seventy-two hours is three days. Three weeks is 21 days. 21 + 3 = 24 There are twenty-four (24) days in three weeks and seventy-two hours.
Because its advantages over three phase are outweighed by the cost of additional conductors.