answersLogoWhite

0


Best Answer

Possibly if you find out somehow

User Avatar

Wiki User

11y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Can you block hole in a plant pot with cement to make a patio pond?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is oil well cement?

Cementing a well is either pumping cement into the drilled hole to decomission or plug up the hole, or to pump cement in between the casing (pipe) and the hole itself. This allows control of pressurized oil leaking from the hole.


Can you mix cement in the hole you dug?

Yes, but the walls of the hole may contaminate the cement. Mixing the cement may be very hard, and precarious. Further, you may not be able to remove all the cement from the hold afterwards. It is more advisable to use a cement-mixer.


How do you fix a hole in a wall?

Get a plastic sheet and then cement it


What causes a hole in a engine block?

A hole in your block comes from massive mechanical failure. Mostly a broke rod or crank. If you have a hole in your block, you need a new motor.


How do you patch a hole in a cement wall?

Use a good quality cement and push the cement in as far as you can, if it a thru-hole, do the same on the inside, smooth one or both patches flush. If its below ground level apply a "Tar base material" to the patch after the cement dries, this will help in waterproofing the patch.


Where can I get a good umbrella?

http://www.kelmarkfurnishings.com/aluminum-patio-umbrellas/3022.html is a link to a very good, cheap, affordable patio umbrella. It is 10 Ft. Tall and fits most patio tables with a patio umbrella hole.


What does Nathan radley do to the tree where the gifts are placed?

Nathan Radley fills the hole in the tree where gifts are placed with cement to stop Boo Radley from communicating with Scout and Jem.


What is a Hole in engine block?

A hole in the engine block is God's way of telling you to get a different car. You get a hole in the engine block when a piece of your engine--normally a rod cap--comes off at full speed and goes through the side of the block. And there's no way to fix it.


How does a free-standing patio umbrella work?

These are patio umbrellas that do not need the support of a table to stand up right. Many patio umbrellas fit into a hole in the patio table and are therefore supported. A free standing umbrella can stand on its own, and has an arm which allows it to cover people.


What happens to the hole in the tree and what reason is given in To Kill a Mockingbird?

it gets covered with cement.


How do you you pump a balanced cement plug?

Balanced cement plug is pumped through drill string or open-ended tubing. 'Balanced Cement Plug' means that the top of cement outside the drillstring/ tubing will be the same height as the top of cement inside the drillstring at the end of pumping. The drillstring/ tubing is then slowly pulled from the wet cement, allowing the cement inside the string to fill the centre of the plug. There are lots of refinements in this method with open hole cement retainers or high viscosity 'cushions' often placed below cement. In vertical hole, most balanced plugs are successful. In extended reach wells, failure rates can be high with cement slumping and mixing with synthetic based muds. A typical checklist to improve cement plug success in extended reach wells would have: 1. Always use a tailpipe. This reduces the disruption to the plug caused by removal of the drillstring. 2. Clean up the hole thoroughly before pumping cement. Cement is an excellent hole cleaner. Many 'flash set' events reported are really packoffs caused by cement picking up a cuttings dune. 3. Put a diverter tool with BIG holes on the bottom of the tailpipe. This directs fluids up the hole during cementing 4. Use a scavenger spacer in front of the cement job to convert the formation from oil wet to water wet. 5. Slow down pumping to 1 BPM while displacing cement into open hole. This reduces mixing of cement and mud. 6. Put a cushion below the cement plug. A cement retainer is best. If a viscous cushion is spotted, weight the cushion to 1 ppg below the cement weight. 7. Gravity is NOT on your side. Cement can stay inside the tail pipe as you pull it from the plug. Pump the volume of cement inside the tailpipe as you pull the tailpipe from the plug. 8. Circulate clean the long way with the bottom of the tailpipe at the planned cement plug top.


What is the answer to 135 in Professor Layton and the Curious Village?

Move the lower green block to the right of the purple block right Move the top right green block down Move the top right blue block right Move the purple block up Move the blue block below the hole up Move the bottom right green block left one space Move the green block above the bottom right hole down Move the blue block below the purple block right Move the purple block down Move the green block to the right of the hole left and up Move the green block to the right of the hole left Move the blue block below the hole up Move the green block to the right of the purple block up and right Move the purple block right Move the green block above the hole down Move the topmost green block down Move the top right blue block left Move the rightmost blue block left Move the top right green block up Move the bottom right green block up Move the purple block right Move the green block to the right of the red block right and down Move the blue block above the hole down Move the top right blue block down Move the top left blue block right Move the red block up Move the bottom left blue block up Move the bottom left green block left Move the green block to the right of the hole left Move the bottom right blue block down Move the leftmost blue block right Move the red block down Move the top blue block left Move the blue block below the hole up Move the green block to the right of the hole left Move the top right green block down and left Move the purple block up Move the blue block to the right of the red block right Move the bottom blue block right Move the green block above the hole down Move the red block right Move the bottom left green block up Move the green block to the right of the hole left and up Move the green block below the red block left Move the bottom right blue block left Move the rightmost blue block down Move the rightmost green block down and right Move the red block right Move the top left green block right and down Move the top left blue block down Move the topmost blue block left Move the red block up Move the green block to the left of the hole right one space Move the top left green block right Move the bottom left green block up Move the bottom left blue block left Move the bottom right blue block left Move the rightmost green block down Move the green block to the left of the hole right Move the red block down Move the top left blue block right Move the blue block below the hole up Move the leftmost green block up Move the green block to the left of the red block up Move the bottom left blue block up Move the bottom blue block left Move the red block down Move the green block to the left of the hole right Move the leftmost green block right Move the top left blue block down Move the top blue block left Move the green block to the left of the purple block up and left Move the purple block left Move the green block below the hole up Move the bottom right green block up Move the red block right Move the green block above the hole down Move the top left green block down Move the purple block left Move the green block above the red block left and up Move the red block to the exit