No. Concrete won't bond to concrete. It will end up cracking.
about how much to pour a concrete slaba 12 x 14'
If there are no seams in it - it was not poured in sections, but as one continuous pour.
You should be able to pour an additional 3" over the new section. It wouldn't hurt to coat the existing with a bonding agent, after "keying" the surface by roughening it so that the new slab grips onto the old. First check whether these was a reason for the slab being laid at that level. Is it to do with the moisture barrier of the new slab? Slabs that do not have moisture barriers are often set below those that do to reduce the chance of moisture entering the dryer slab. If the slab level is a mistake then any contractor who poured it should be liable to pour a topping slab to bring it the correct height.
129
Also reffered to as 'slab footing' and it consists of concrete footing beams integrated into the concrete floor slab.
about how much to pour a concrete slaba 12 x 14'
If there are no seams in it - it was not poured in sections, but as one continuous pour.
Building a concrete slab is not difficult. Simply excavate the area where the slab is to go, and build a wooden box frame around it. Then, add crushed stone and pour the concrete on top. Finally, just smooth it out and allow it to dry.
6.67 Cubic Yards
20
7.1
You should be able to pour an additional 3" over the new section. It wouldn't hurt to coat the existing with a bonding agent, after "keying" the surface by roughening it so that the new slab grips onto the old. First check whether these was a reason for the slab being laid at that level. Is it to do with the moisture barrier of the new slab? Slabs that do not have moisture barriers are often set below those that do to reduce the chance of moisture entering the dryer slab. If the slab level is a mistake then any contractor who poured it should be liable to pour a topping slab to bring it the correct height.
15 cubic yards
15 cubic yards
129
A pour of concrete, all at a single time. Also called a one-pour system. Contrast with two-pour system. At the same time you pour the floor, you are going to pour the perimeter footings. This is called a monolithic pour (or monolithic slab).
4.938 cubic yards.