answersLogoWhite

0


Best Answer

iIDK

User Avatar

Wiki User

10y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Explain the difference between activity duration estimating and estimating the effort required to perform an activity?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Is a kitchen scale required to make French macarons?

Depends how good you are at estimating measurements


What is the duration of Some Assembly Required TV series?

The duration of Some Assembly Required - TV series - is 3600.0 seconds.


What is required for life activity?

Oxygen, water, and life is required for life activity. Also ap-ma-spere<-(i couldn't spell it) is required, maybe...


What is crashing in CPM technique and what is time-cost ratio and how is it useful in crashing?

crashing is the technique of minimizing the total duration of a network of activities, mainly by reducing the duration of the critical path activities to the least possible magnitude. Since the critical path is also the longest, the duration of this path has to be reduced. However any reduction in activity duration comes at the cost of increased cost due to extra resources required(like labor, electricity etc). Also note that simply reducing the duration of a critical path activity is meaningless unless the duration of parallel activities are also reduced by equal magnitude. Then and only then will the total duration get reduced. Sometimes the non-critical path activities have floats(ie expendeble time). In such a case while crashing such an activity, first the floats are removed. Only then can its total duration be reduced.


What is crashing in CPM technique and what is time cost ratio and how is it useful in crashing?

crashing is the technique of minimizing the total duration of a network of activities, mainly by reducing the duration of the critical path activities to the least possible magnitude. Since the critical path is also the longest, the duration of this path has to be reduced. However any reduction in activity duration comes at the cost of increased cost due to extra resources required(like labor, electricity etc). Also note that simply reducing the duration of a critical path activity is meaningless unless the duration of parallel activities are also reduced by equal magnitude. Then and only then will the total duration get reduced. Sometimes the non-critical path activities have floats(ie expendeble time). In such a case while crashing such an activity, first the floats are removed. Only then can its total duration be reduced.


What is required for sperm activity?

puberty.


How can you estimate the value of an irrational number?

There are different methods for estimating irrational numbers. For numbers like pi or e, there are infinite series which can be used to calculate their value to the required degree of accuracy. There are numerical methods - such as the Newton-Raphson iteration - for estimating roots of numbers.


Is Jim required to assist the PM in this activity?

This question cannot be answered without first specifying the activity.


When muscles can no longer perform a required activity?

Muscle fatigue


Is it possible to kill bedbugs by freezing?

Of course, but the duration required is as yet not established.


What is requiring energy?

Energy is required for activity to happen within a sysytem


What is an economic or productive factor required to accomplish an activity?

resource