Certain companies exist that have pumping equipment that will hydraulically lift the slab to the desired height. It's called slab jacking. Other than that, it would be best to tear out and replace the existing slab, using an adequate base material to prevent future settling.
4 To 6 inches
Concrete driveways are no less than 3.5 inches to 4.5 inches.
You have to break it with a sledge hammer , cut it, dynamite it, dig it up or lift it up with a fork lift or caterpiller.
No. Concrete won't bond to concrete. It will end up cracking.
Also reffered to as 'slab footing' and it consists of concrete footing beams integrated into the concrete floor slab.
4 To 6 inches
Concrete driveways are no less than 3.5 inches to 4.5 inches.
You have to break it with a sledge hammer , cut it, dynamite it, dig it up or lift it up with a fork lift or caterpiller.
You need to specify the slab's width and the length as well.
Concrete weighs approx 150 pounds per cubic foot. This slab would weigh approx 1188 pounds.
A 10-foot round slab at 4 inches requires 1 cubic yard.
9.3 cubic yards of cement is required for this slab.
You need to specify the slab's width and the length as well.
There are 3 feet in 1 yard There are 12inches in 1 foot There are therefore 36 inches in a yard, 1296 square inches in 1 square yard and 46656 cubic inches in 1 cubic yard. A 150 sq ft slab therefore is equivalent to a 21560 square inch slab, if this slab is 4 inches deep then it comprises 86400 cubic inches of concrete. Thus the number of cubic Yards of concrete you require is 86400/46656 = 1.85 i.e. (almost 2).
7.1
Supended slab are slab not sit on the ground directlySuspended slab is a slab supported by beams.
6.67 Cubic Yards