Want this question answered?
ideally 28 days
First of all, concrete does not "dry" to become hard. It cures, which is a chemical interaction between its water and its portland cement. Usually, a couple of hours is plenty of time for concrete to 'set' enough to not be damaged by rain. The best and strongest concrete never dries out for the first 28 days from pouring it.
A mud rake is a type of rake that is used to create a flat surface when pouring concrete. A mud rake looks like a rake with a long handle and a flat surface for pulling concrete.
Imediatly after trowling
It's simply hardened steel that's been cast in long rods. It's used as reinforcing when pouring concrete to increase the strwength - especially in road construction or building foundations.
Depending on what kind of sealer you use, the concrete should be completely dry and firm enough to walk on. However, I know of at least one concrete sealer (Concrete Treat) that can be applied immediately after the concrete has been placed -- with no wait at all for curing. Check out the products as you go and see what might work best for you. See the attached link.
There is no concrete answer because the time taken would vary depending on the speed at which you were driving at.
127 hours
probably about 30-50 years
At least 3 days
53 and 1/3 cubic feet, concrete is normally sold buy the cubic yard, this would be 1.975 cubic yards. Figure on 2.25 CU yards to be safe. You do not want to run short when pouring concrete.
How long will a driveway of concrete last in Louisiana?