answersLogoWhite

0


Want this question answered?

Be notified when an answer is posted

Add your answer:

Earn +20 pts
Q: How long does it take for a concrete sidewalk to harden?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

How long does it take for grape popsicle to harden?

It takes at least 3 days to harden.


How long does it take paint to dry and harden on a newly painted car?

At least a month to dry and another week to harden


How long does it take for concrete to harden?

it takes 28 days to fully cure, It would be advisable not to drive on it before that because of micro cracks, which will continue to migrate through time, causing spiderwebbing outside of your control joints, Depends on the cement used some quick cure cements can harden in an hour


How long did it take for the concrete to dry?

is a scinentific method


How many raindrops does it take to flood a sidewalk?

I'd say that would depend on the size of the sidewalk.


How long should bitumen take to dry when brushed over a internal concrete floor?

how long does it take for bituman to dry outside


How long does it take for wax to decompose?

I hope it doesn't take too long, considering my dad poured hot wax into one of our toilets. He said that he wanted to see wax harden instantly.


How long does it take for concrete blocks to degrade?

around 60-75 years


Jane can shovel the snow from the sidewalk in 45 minutes if jane and joe work together it takes them 25 minutes to shovel the sidewalk how long will it take joe to do the job if he works alone?

45-25=20 minutes


What is the plural of walk?

If you are using walk as a noun (taking a walk, or a sidewalk), the plural is simply walks. E.g. She likes to take long walks.


How many days does cement take to cure completely?

Generally 30 days brings concrete to to specified compression strength. Concrete may take 30 years to cure.AnswerConcrete will harden to about 80% strength in 2-3 days and close to 100% strength in 28 days. Concrete driveways should be towards the latter end prior to driving on them. AnswerAs a former concrete inspector, I would agree with the first answer. AnswerConcrete takes 50 years to completely cure and then takes 50 years to break down


How many cubic yards of cement will it take for a sidewalk 3ft wide by 4in deep by 100 ft long?

You will need 3.7 cubic yards of cement.